Agenda item

17/06709/FUL - Corrindale, The Street, Teffont Magna, SP3 5QP

Construction of a new house and vehicular access

Minutes:

Public Participation

Rowena Taylor spoke in objection to the application

Chris Edwick spoke in support to the application

David Gregory spoke in support to the application

Cllr Tony Deane spoke on behalf of the Parish Council.

 

The Senior Planning Officer Lucy Minting introduced the report detailing the proposed construction of a new house and vehicular access, which was recommended for Approval.

 

The proposals included the removal of five trees, with the dwelling set in to the existing landscaping. Level one was an under croft area, Level 2 included the  entrance, and Level 3 had 3 bedrooms and a study.

 

The site was part of a previously proposed development which had been refused.

 

The recommendation included the removal of permitted development rights.

 

Members then had the opportunity to ask technical questions, where it was clarified that the proposed access to the site would be a new access.

 

Members of the public then had the opportunity to present their views as detailed above.

 

Cllr Tony Deane spoke on behalf of Teffont PC, as Cllr Wood had sent his apologies. He noted that the PC’s objections were included in the agenda, adding that it recognised there would be a house at this site at some time, however the present design was considered as over development of the plot. Cllr Dean thanked the Officers for the balanced report and conclusion.

 

The Division Member Cllr Bridget Wayman then spoke in Objection to the application, noting that there had been around 15 new properties in Teffont over the last 10 years, which she felt was quite a high number.

 

Teffont was a small village, the site lay within the designated conservation area. The Teffont VDS had a section on the settlement layout of the village. If this site was granted permission there would be a further decline in gaps between dwellings within Teffont. She urged the Committee to refuse this application.

 

Cllr Devine moved the motion of approval this was seconded by Cllr John Smale.

 

He noted that this would be a perfect place for infill in this village. He felt that if someone was proposing to bring a family with young children to settle, this was a good thing.

 

A debate followed where the key issues raised included, that a house on this site would fill an obvious space, however to minimise the excavation to the rear of the property had been brought forward, in comparison to the neighbouring dwellings.

 

The proposals had been changed to reflect the comments of the Conservation Officer, to move the dwelling back and down in height, through further excavation.

 

The design was imaginative, and there was already a good mix of historic and contemporary design properties in the village.

 

Resolved

That application 17/06709/FUL be APPROVED with conditions:

 

(1) The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

REASON: To comply with the provisions of Section 91 of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004.

 

(2) The development hereby permitted shall be carried out in accordance with the following approved plans:

Plan Ref: 1689.P-01 Rev A, received by this office 02/11/2017

Plan Ref: 1689.P.02 Rev A, received by this office 02/11/2017

Plan Ref: 1:1250 Location Plan Position of Cottage Revised Oct 2017, received by this office 03/11/2017

Biodiversity survey/assessment, received by this office 12/07/2017

REASON:  For the avoidance of doubt and in the interests of proper planning.

 

(3) No development shall commence within the area indicated (proposed development site) until:

         A written programme of archaeological investigation, which should include on-site work and off-site work such as the analysis, publishing and archiving of the results, has been submitted to and approved by the Local Planning Authority; and

         The approved programme of archaeological work has been carried out in accordance with the approved details.

REASON:  To enable the recording of any matters of archaeological interest.

 

(4)  No development shall commence on site until a scheme for the discharge of surface water from the site access/driveway, incorporating sustainable drainage details, together with permeability test results to BRE365, to prevent discharge onto the highway has been submitted to and approved in writing by the Local Planning Authority. The development shall not be first occupied until surface water drainage has been constructed in accordance with the approved scheme.

REASON: To ensure that the development can be adequately drained, in the interests of highway safety.

 

(5) No development shall commence on site until a scheme of hard and soft landscaping has been submitted to and approved in writing by the Local Planning Authority, the details of which shall include:-

• location and current canopy spread of all existing trees and hedgerows on the land;

• full details of any to be retained, together with measures for their protection in the course of development;

• a detailed planting specification showing all plant species, supply and planting sizes and planting densities;

• finished levels and contours;

• means of enclosure;

• all hard and soft surfacing materials;

REASON: The application contained insufficient information to enable this matter to be considered prior to granting planning permission and the matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to ensure a satisfactory landscaped setting for the development and the protection of existing important landscape features, in the interests of visual amenity and the character and appearance of the area.

 

(6) All soft landscaping comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the first occupation of the building(s) or the completion of the development whichever is the sooner; All shrubs, trees and hedge planting shall be maintained free from weeds and shall be protected from damage by vermin and stock. Any trees or plants which, within a period of five years, die, are removed, or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local planning authority.  All hard landscaping shall also be carried out in accordance with the approved details prior to the occupation of any part of the development or in accordance with a programme to be agreed in writing with the Local Planning Authority.

REASON: To ensure a satisfactory landscaped setting for the development and the protection of existing important landscape features.

 

(7) No demolition, site clearance or development shall commence on site, and; no equipment, machinery or materials shall be brought on to site for the purpose of development, until a Tree Protection Plan showing the exact position of each tree/s and their protective fencing in accordance with British Standard 5837: 2012: “Trees in Relation to Design, Demolition and Construction -Recommendations”; has been submitted to and approved in writing by the Local Planning Authority, and;

The protective fencing shall be erected in accordance with the approved details. The protective fencing shall remain in place for the entire development phase and until all equipment, machinery and surplus materials have been removed from the site. Such fencing shall not be removed or breached during construction operations.

No retained tree/s shall be cut down, uprooted or destroyed, nor shall any retained tree/s be topped or lopped other than in accordance with the approved plans and particulars. Any topping or lopping approval shall be carried out in accordance British Standard 3998: 2010 “Tree Work – Recommendations” or arboricultural techniques where it can be demonstrated to be in the interest of good arboricultural practise.

If any retained tree is removed, uprooted, destroyed or dies, another tree shall be planted at the same place, at a size and species and planted at such time, that must be agreed in writing with the Local Planning Authority.

No fires shall be lit within 15 metres of the furthest extent of the canopy of any retained trees or hedgerows or adjoining land and no concrete, oil, cement, bitumen or other chemicals shall be mixed or stored within 10 metres of the trunk of any tree or group of trees to be retained on the site or adjoining land.

[In this condition “retained tree” means an existing tree which is to be retained in accordance with the approved plans and particulars; and paragraphs above shall have effect until the expiration of five years from the first occupation or the completion of the development, whichever is the later].

REASON: The application contained insufficient information to enable this matter to be considered prior to granting planning permission and the matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to enable the Local Planning Authority to ensure the retention of trees on the site in the interests of visual amenity.

 

(8)  Notwithstanding the approved drawings, no walls of the development hereby permitted shall be constructed until details of the following have been submitted to and approved in writing by the Local Planning Authority:

(i) Large scale details of all external joinery (1:5 elevation, 1:2 section) including vertical and horizontal cross-sections through openings to show the positions of joinery within openings, depth of reveal, heads, sills and lintels;

(ii) Full details of proposed rooflights and solar panels, which shall be set in plane with the roof covering;

(iii) Full details of external flues including finish, background and mechanical ventilation, soil/vent pipes and their exits to the open air;

(iv) Full details of rainwater goods;

(v) Large scale details of proposed eaves and verges (1:5 section)

The works shall be carried out in accordance with the approved details.

REASON: The application contained insufficient information to enable this matter to be considered prior to granting planning permission and the matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, in the interests of visual amenity and the character and appearance of the area, to ensure that the development is appropriately detailed due to its location within the conservation area and setting of listed building.

 

(9)  All windows shall be of timber. No paint or stain finish shall be applied to external timber until details of the paint or stain to be applied have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details prior to the development being first occupied.

REASON:  In the interests of visual amenity and the character and appearance of the area, to ensure that the development is appropriately detailed due to its location within the conservation area.

 

(10) No walls of the development hereby permitted shall be constructed until details and samples of the materials and finishes to be used for the external walls and roofs have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.

REASON: In the interests of visual amenity and the character and appearance of the area.

 

(11) No walls of the development hereby permitted shall be constructed until a sample panel of stonework, not less than 1 metre square, has been constructed on site, inspected and approved in writing by the Local Planning Authority.  The panel shall then be left in position for comparison whilst the development is carried out. Development shall be carried out in accordance with the approved sample.

REASON: In the interests of visual amenity and the character and appearance of the area.

 

(12) No external lighting shall be installed on site until details of external lighting have been submitted to and approved in writing by the Local Planning Authority. The approved lighting shall be installed and shall be maintained in accordance with the approved details and no additional external lighting shall be installed.

REASON: In the interests of the amenities of the area and to minimise unnecessary light spillage above and outside the development site, to prevent light pollution and harm to the AONB.

 

(13) The development hereby permitted shall not be first occupied until the first five metres of the access, measured from the edge of the carriageway, has been consolidated and surfaced (not loose stone or gravel). The access shall be maintained as such thereafter.

REASON: In the interests of highway safety.

 

(14) No part of the development hereby permitted shall be first occupied until the access, turning area and parking spaces (including the undercroft car and cycle parking spaces) have been completed in accordance with the details shown on the approved plans. The areas shall be maintained for those purposes at all times thereafter.

REASON: In the interests of highway safety.

 

(15) The development hereby permitted shall not be occupied until the area between the nearside carriageway edge and a line drawn 2.4m metres parallel thereto over the entire site frontage has been cleared of any obstruction to visibility at and above a height of 600mm above the nearside carriageway level. That area shall be maintained free of obstruction at all times thereafter.

REASON: In the interests of highway safety.

 

(16) The development shall be undertaken and completed in accordance with recommendations and precautionary mitigation measures outline on section 5 of the Biodiversity survey/assessment Version 2 dated 11 May 2017.

REASON:  To ensure adequate protection, mitigation and compensation for protected species.

 

(17) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (as amended by the Town and Country Planning (General Permitted Development) (Amendment) (No.2) (England) Order 2008 (or any Order revoking or re-enacting or amending that Order with or without modification), there shall be no additions to, or extensions or enlargements of any building forming part of the development hereby permitted.

REASON:  In the interests of the amenity of the area and to enable the Local Planning Authority to consider individually whether planning permission should be granted for additions, extensions or enlargements.

 

(18) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (as amended by the Town and Country Planning (General Permitted Development) (Amendment) (No.2) (England) Order 2008 (or any Order revoking or re-enacting or amending that Order with or without modification), no window, dormer window or rooflight, other than those shown on the approved plans, shall be inserted in the elevations, roofslopes or gable ends of the development hereby permitted.

REASON:  To safeguard the character and appearance of the area and in the interests of residential amenity.

 

(19) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking or re-enacting or amending that Order with or without modification), no garages, sheds, greenhouses and other ancillary domestic outbuildings shall be erected anywhere on the site on the approved plans.

REASON: To safeguard the character and appearance of the area.

 

INFORMATIVE: Material samples

Please note that Council offices do not have the facility to receive material samples. Please deliver material samples to site and inform the Planning Officer where they are to be found.

 

INFORMATIVE: External lighting

The application site is located within the countryside of the AONB which is currently bidding for ‘Dark Sky Reserve Status’ (further information can be found via - http://www.ccwwdaonb.org.uk/our-work/dark-night-skies/).

It is therefore recommended the applicant consider a scheme of screening/louvres to be attached to and used on all approved rooflight windows in the interests of the amenities of the area and to minimise unnecessary light spillage above and outside the development site.

In considering any proposed external lighting, the applicant should comply with the Cranborne Chase and West Wiltshire Downs AONB position statement on Light Pollution available from: http://www.ccwwdaonb.org.uk/projects/pub_other.htm

 

INFORMATIVE: CIL

The applicant is advised that the development hereby approved may represent chargeable development under the Community Infrastructure Levy Regulations 2010 (as amended) and Wiltshire Council's CIL Charging Schedule. If the development is determined to be liable for CIL, a Liability Notice will be issued notifying you of the amount of CIL payment due. If an Additional Information Form has not already been submitted, please submit it now so that we can determine the CIL liability. In addition, you may be able to claim exemption or relief, in which case, please submit the relevant form so that we can determine your eligibility. The CIL Commencement Notice and Assumption of Liability must be submitted to Wiltshire Council prior to commencement of development.  Should development commence prior to the CIL Liability Notice being issued by the local planning authority, any CIL exemption or relief will not apply and full payment will be required in full and with immediate effect. Should you require further information or to download the CIL forms please refer to the Council's Website www.wiltshire.gov.uk/planninganddevelopment/planningpolicy/communityinfrastructurelevy.

 

INFORMATIVE TO APPLICANT: Works on the highway

The application involves an extension to the existing dropped kerb.  The consent hereby granted shall not be construed as authority to carry out works on the highway.  The applicant is advised that a licence will be required from Wiltshire’s Highway Authority before any works are carried out on any footway, footpath, carriageway, verge or other land forming part of the highway. Please contact our Vehicle Crossing Team on vehicleaccess@wiltshire.gov.uk and/or 01225 713352.

 

INFORMATIVE TO APPLICANT: Archaeological work

The work should be conducted by a professionally recognised archaeological contractor in accordance with a written scheme of investigation approved by this office and there will be a financial implication for the applicant.

If archaeological remains are encountered, this may have an effect on the programme of works.

 

INFORMATIVE TO APPLICANT: Exhumation of Human Remains

Nothing in this permission shall authorise the exhumation, removal, or interference with human remains which may exist on the site. Separate legislation exists for such matters.

 

INFORMATIVE TO APPLICANT: Wessex Water

Water Supply and Waste Connections

New water supply and waste water connections will be required from Wessex water to serve this proposed development. Application forms and guidance information is available from the Developer Services web-pages at our website www.wessexwater.co.uk.

Further information can be obtained from our New Connections Team by telephoning 01225 526222 for Water Supply and 01225 526333 for Waste Water.

Separate Sewer Systems

Separate systems of drainage will be required to serve the proposed development.

No surface water connections will be permitted to the foul sewer system.

Please find attached an extract from our records showing the approximate location of our apparatus within the vicinity of the site (this letter can be found on the application file which can be viewed on the council's website against the relevant application record)

 

INFORMATIVE TO APPLICANT: Surface Water and Foul Drainage

The application form states foul drainage disposal will be main sewer – the applicant will need to investigate the location of existing foul drainage system and pipework within the site as there may be S105A public sewers crossing the site which would require permission from Wessex Water.

The application form states storm water drainage disposal to be via a soakaway in the driveway – Any proposed use of soakaways will need to be backed up by permeability testing to BRE 365 plus in chalk areas any soakaway needs to be at least 10m from buildings/structures.

 

INFORMATIVE TO APPLICANT: Wildlife and Countryside Act

The applicant should note that under the terms of the Wildlife and Countryside Act (1981) and the Habitats Regulations (2010) it is an offence to disturb or harm any protected species, or to damage or disturb their habitat or resting place. Please note that this consent does not override the statutory protection afforded to any such species. In the event that your proposals could potentially affect a protected species you should seek the advice of a suitably qualified and experienced ecologist and consider the need for a licence from Natural England prior to commencing works. Please see Natural England’s website for further information on protected species.

 

 

 

Supporting documents: