Councillor Nick Holder, Cabinet Member for
Highways, Street Scene, and Flooding, alongside Samantha Howell,
Director for Highways and Transport, and Paul Bromley, Highways
Asset Manager, provided an overview of recent previous investment
in carriageway resurfacing activities broken down by Area
Board.
It was emphasised that effective and efficient
highway asset management was essential in allowing residents,
businesses, and visitors to Wiltshire to undertake travel in and
around the county to meet daily needs, as well as for leisure and
recreation. Furthermore, officers took an evidence-led risk-based
approach to asset management in line with agreed best practice and
adopted policies, with frequent updates provided through the
Engagement Strategy. It was explained that the principles of asset
management had been applied to the maintenance of the network which
involved accounting for the life cycle of the asset by undertaking
regular surveys and monitoring performance of the network,
interventions, and investment strategies within the objective of
minimising expenditure while providing the desired outcomes for
Wiltshire.
It was acknowledged that a lack of
availability across the highway network could cause considerable
impacts on communities and the economy. As such, the report set out
investment as records allowed broadly over a 5
year period, with detailed analysis being undertaking to
ensure that investment in the network continued to be targeted at
the right areas. Paragraphs 9 to 11 of the report were noted as
providing a full explanation of the analysis informing the
Wiltshire Highways Investment Plan and historic condition data
broken down by Area Board.
Finally, Paragraph 5 of the report was
highlighted alongside Figure 3 through 9 which detailed planned
major carriageway maintenance from 2018/19 to October 2024.
During the discussion, points included:
- It was explained that officers
assessed the immediate risk to residents when undertaking reactive
maintenance/treatments in different areas, hence why the data
showed a spread of different activities taking place which had
deemed to be the best reactive measure to tackle that immediate
issue. It was noted that higher expenditure levels varied across
each of the community areas which could be as a
result of increased reporting by residents, and the
variability in carriageway length, type, topography, geography, and
traffic levels.
- It was confirmed that final testing
was underway for the MyWilts app which
was due to go live on 19 November 2024.
- With regard
to works undertaken by utility companies, officers explained
that companies were required to reinstate the network to
appropriate levels, but monitoring the number of utility works
across the network was resource intensive for the Council. However,
Members were reassured that officers were working hard in terms of
ensuring reinstatements were done correctly, in a timely manner,
and then monitored. In the event that
the reinstatements were not satisfactory, there were escalation
processes in place and that these accounted for instances in which
officers would not issue any permits for further works until an
agreement was met.
- It was confirmed that not all
vehicles were equipped with vehicle mounted lasers to undertake
scanner surveys, however this was being considered as part of the
Fleet Replacement Strategy. Furthermore, there was an annual survey
to assess defects to feed into a road condition index that picked
up 50% of the A Class road network in
both directions which alternated each year, 100% of the B Class
road network in one direction, 50% of the C Class road network in
one direction, and then 50% of unclassified roads. It was also
highlighted that highway safety inspections were also carried out
on a monthly basis, predominantly for
safety defects, on A and B Class roads, and annual inspections on
residential streets.
- Members were also informed that
officers were trialling a new piece of technology called Vaisala
which used AI to recognise certain defects and build a condition
pattern. In tandem with current scanner data, this would enable
officers to continue improving decision making, better understand
deterioration curves for each road, and the best time to intervene
to get the cost benefit.
- It was explained that when
considering preventative maintenance and the annual Forward Work
Plan, discussions were had with Area Boards, Parish and Town
Councils to understand local concerns and recommendations for
future work. These conversations were then assessed in line with
the evidence-led risk-based approach to identify whether repairs
were appropriate, and it was highlighted that recent additional
investments had allowed officers to specifically address some
Member concerns in areas where it might not have been feasible in
the past.
- The threat to infrastructure from
climate change was raised and Members emphasised the importance of
understanding historic costs to determine what maintenance would be
sufficient and the future needs of the county and budgeting moving
forwards. Officers acknowledged Member concerns and highlighted
that the report should be seen as one part of the response to
climate change and adaption.
- Officers reiterated the variability
of the network in terms of road types, topography, and geological
conditions and noted that cost projections were difficult due to
Central Government settlements not being fully understood. As such,
officers had taken a proportional approach in terms of supplying
historic data in an easily accessible format to then focus on the
delivery of the work across the network. Furthermore, it was noted
that Figure 3 demonstrated that no one community area was
disadvantaged in terms of the range of investment measures across
the county and mitigating risk, particularly in areas where there
were higher traffic levels and therefore a higher safety
concern.
- Members queried what redress the
Council had against historic contractors and mutual expectations
after the conclusion of the contract if repairs were needed. In
terms of specific recourse, officers noted that it would be
addressed in future reports once further information had been
gathered. However, it was explained that there was a general
recourse in terms of standards of work through the procurement
process.
- Officers noted that additional
investment had been allocated to support rural overrun but
highlighted the challenges with regard
to the extent of the rural network across the County and
land ownership constraints in many areas.
At the conclusion of the discussion, it
was:
Resolved:
The Committee:
a)
Noted the contents of the report and the progress that is being
made.
b)
Requested a new report in January 2025, breaking down spend in
detail by area and road categories.
c)
Requested that future Highways Review of Service reports
incorporated a breakdown of expenditure information in its Highways
Investment Plans.