PL/2021/07203 - Land at Marshall Road, Devizes, Wiltshire

Development of up to 170 homes, means of pedestrian and vehicular access, landscaping, public open space, drainage and associated infrastructure works.

 

Minutes:

Public Participation

Chris Long spoke in objection to the application.

Richard Ormerod, Trust for Devizes, spoke in objection to the application.

Andy Turner, agent, spoke in support of the application.

 

The Senior Planning Officer, Jonathan James, presented a report which recommended permission be granted for development of up to 170 homes, means of pedestrian and vehicular access, landscaping, public open space, drainage and associated infrastructure works. The application was outline only with means of access, with all other details such as layout and design to follow in a further application if the outline was approved. Details were provided of late representations received since publication of the report.

 

Key issues included the principle of the application, ecological impacts and the preservation or enhancement of the historic environment, impact on the highways and agricultural land. The site lay outside the limits of development for Devizes in what was defined as open countryside, but it was stated that due to the shortfall in the five year housing land supply planning policy supported approval of the application as a sustainable development. The town council were supportive of the proposal following amendment of the initial application, which included a reduction in the overall number of properties.

 

Members of the Committee were given the opportunity to ask technical questions. Details were sought on integration of footpaths and cyclepaths within the site, whether any reserved matters application would also be considered by the Committee, the mix of affordable housing proposed, and at what point Community Infrastructure Levy would be calculated. Questions were raised about the archaeological assessment that would take place, and the potential impact on any reserved matters application should investigations reveal matters of archaeological interest. Confirmation was also sought on the extent of the application site including pedestrian access, and that the agricultural land grade of the site was 1, the highest level.

 

Members of the public then had the opportunity to present their views to the Committee, as detailed above.

 

The Unitary Member, Councillor Simon Jacobs, then spoke in support of the application.

 

A debate followed, where the detail and extent of conditions proposed to mitigate concerns was raised, as well as the proximity to the nearby waste transfer station. There was discussion of council strategies on active travel, encouraging the applicants to engage with the Trust for Devizes, the ongoing position of the council’s five year housing land supply, the support of the local council and sustainability of the site, the loss of high quality agricultural land and the measures of improved biodiversity.

 

On the motion of Councillor Howard Greenman, seconded by Councillor Tony Trotman, to approve the officer recommendation to grant permission, with a requirement to consult with the county archaeologist and informatives in relation to consultation and cycleways, at the conclusion of debate it was,

 

In accordance with the requirement to consult with the county archaeologist, the county archaeologist has since confirmed that he is satisfied that a condition requiring a Written Scheme of Investigation for archaeology to be submitted and approved in advance of other operations, and then implemented as approved, is an appropriate approach in this instance, as set out in the original committee report.

 

Resolved:

 

Defer and Delegate to the Head of Development Management to grant outline planning permission subject to the conditions set out below and to the prior completion of a Section 106 legal agreement to cover the contributions identified in Section 10 of the report.

 

Conditions: (28)

1     The development hereby permitted shall be begun either before the expiration of three years from the date of this permission, or before the expiration of two years from the date of approval of the last of the reserved matters to be approved, whichever is the later.

 

REASON: To comply with the provisions of Section 92 of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004.

 

2     No development shall commence on site until details of the following matters (in respect of which approval is expressly reserved) have been submitted to, and approved in writing by, the Local Planning Authority:

(a) The scale of the development;

(b) The layout of the development;

(c) The external appearance of the development;

(d) The landscaping of the site.

The development shall be carried out in accordance with the approved details.

 

REASON: The application was made for outline planning permission and is granted to comply with the provisions of Section 92 of the Town and Country Planning Act 1990 and Article 3(1) of the Town and Country Planning (General Development Procedure) Order 1995.

NOTE: The landscaping scheme, as a minimum, shall include the details as identified, within ‘Landscaping Informative’, below to be submitted at reserved matters stage.

 

3     An application for the approval of all of the reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission.

 

 

REASON: To comply with the provisions of Section 92 of the Town and Country Planning Act 1990.

 

4     The development hereby permitted shall be carried out in accordance with the following approved plans:

• Site Location Plan, Dwg No. 199 Rev E

• ‘Ecological Parameters Plan’, Dwg No. 0694-TN-F1-REV Rev 1

• ‘Concept Site Access’, Dwg No. 41342/5501/SK01 Rev F

• Design and Access Statement 4110

 

REASON: For the avoidance of doubt and in the interests of proper planning.

 

5     Any application for approval of Reserved Matters shall be designed in struct accordance with the details and parameters set out on the Ecological Parameters Plan (drawing reference. 0694-TN-F1-REV Rev 1) or any variation thereto which is approved in writing by the local planning authority.

 

REASON: For the avoidance of doubt and for the protection, mitigation and enhancement of biodiversity, and of conserving the ecological functionality of the site and to maintain links into the wider landscape area for foraging and commuting wildlife. And in order to establish ecological parameters for the site within which no development can take place and to secure mitigation measures to ensure the site is developed in such a way as to avoid adverse impact to protected habitats and species.

 

6     Notwithstanding any reference to the number of properties proposed contained within the submitted details, any application for approval of Reserved Matters shall be designed in close accordance with the details and parameters as described and illustrated in the approved Design and Access Statement and the principles illustrated within it, specifically:

 

• The ‘design philosophies’ described in the DAS (section 4)

A statement shall be submitted with each Reserved Matters application, which demonstrates how the application proposals are in compliance with the Design and Access Statement.

 

REASON: The DAS includes numerous parameters and a simple design code aimed at delivering a varied, high-quality, locally inspired design, relevant to both the public realm and architecture. NPPF paragraph 134 b) states that significant weight should be given to design that helps raise the standard of design more generally in an area, and weight has been given to this matter in permitting this development, to ensure that high standards of urban design and comprehensively planned development is achieved in accordance with policies of the Core Strategy.

 

7     No development shall commence within the area indicated within the red outline until:

 

a) A written programme of archaeological investigation, which should include on-site work and off-site work such as the analysis, publishing and archiving of the results, has been submitted to and approved by the Local Planning Authority; and

b) The approved programme of archaeological work has been carried out in accordance with the approved details.

 

REASON: The matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to enable the recording of any matters of archaeological interest.

 

8     No development shall commence on site until an investigation of the history and current condition of the site to determine the likelihood of the existence of contamination arising from previous uses has been carried out and all of the following steps have been complied with to the satisfaction of the Local Planning Authority:

 

Step (i) A written report has been submitted to and approved by the Local Planning Authority which shall include details of the previous uses of the site for at least the last 100 years and a description of the current condition of the site with regard to any activities that may have caused contamination. The report shall confirm whether or not it is likely that contamination may be present on the site.

 

Step (ii) If the above report indicates that contamination may be present on or under the site, or if evidence of contamination is found, a more detailed site investigation and risk assessment has been carried out in accordance with DEFRA and Environment Agency’s “Model Procedures for the Management of Land Contamination CLR11” and other authoritative guidance and a report detailing the site investigation and risk assessment shall be submitted to and approved in writing by the Local Planning Authority.

 

Step (iii) If the report submitted pursuant to step (i) or (ii) indicates that remedial works are required, full details have been submitted to the Local Planning Authority and approved in writing and thereafter implemented prior to the commencement of the development or in accordance with a timetable that has been agreed in writing by the Local Planning Authority as part of the approved remediation scheme. On completion of any required remedial works the applicant shall provide written confirmation to the Local Planning Authority that the works have been completed in accordance with the agreed remediation strategy.

 

 

REASON: The matter is required to be agreed with the Local Planning Authority before development commences to ensure that land contamination can be dealt with adequately prior to the use of the site hereby approved by the Local Planning Authority.

 

9     No development shall commence on site until a scheme for the discharge of surface water from the site (including surface water from the access/driveway), incorporating sustainable drainage details, has been submitted to and approved in writing by the Local Planning Authority. The development shall not be first occupied until surface water drainage has been constructed in accordance with the approved scheme.

 

REASON: The matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to ensure that the development can be adequately drained.

 

NOTE: The Lead Local Flood Authority advises that in order to discharge this condition the detail as highlighted within the 'Land drainage Informative' below should be submitted.

 

10   No development shall commence on site until a Construction Method Statement (CMS) has been submitted to and approved in writing by the local planning authority. The CMS shall include details of the measures that will be taken to reduce and manage the emission of noise, vibration and dust during the demolition and/or construction phase of the development. It shall include details of the following:

 

1) An introduction consisting of definitions and abbreviations and project description and location

2) A description of management responsibilities

3) A description of the construction programme

4) Site working hours and a named person for residents to contact

5) Detailed Site logistics arrangements

6) Details regarding parking, deliveries, and storage; including delivery hours (to avoid peak times), parking of vehicles of site operatives and visitors (on site and not on local highways), and storage on site

7) Details regarding dust and noise mitigation

8) Details of the hours of works and other measures to mitigate the impact of construction on the amenity of the area and safety of the highway network; and

9) Communication procedures with the LPA and local community regarding key construction issues – newsletters, fliers etc.

10) The movement of construction vehicles, to include the routes to site

11) The cutting or other processing of building materials on site

12) Wheel washing and vehicle wash down facilities

13) The transportation and storage of waste and building materials

14) The recycling of waste materials (if any)

15) The loading and unloading of equipment, plant and materials

16) The location and use of generators

17) The location of any temporary on site accommodation

18) Where piling is required this must be continuous flight auger piling wherever practicable to minimise impacts

19) The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate

 

The construction/demolition phase of the development will be carried out fully in accordance with the construction method statement at all times.

 

REASON: The matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to minimise detrimental effects to the neighbouring amenities, the amenities of the area in general, detriment to the natural environment through the risks of pollution and dangers to highway safety, during the construction phase.

 

11   Prior to the commencement of works, including demolition, ground works/excavation, site clearance, vegetation clearance and boundary treatment works, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the local planning authority. The Plan shall provide details of the avoidance, mitigation and protective measures to be implemented before and during the construction phase, including but not necessarily limited to, the following:

 

a) Identification of ecological protection areas/buffer zones and tree root protection areas and details of physical means of protection, e.g. exclusion fencing.

b) Working method statements for protected/priority species, such as nesting birds and reptiles.

c) Mitigation strategies already agreed with the local planning authority prior to determination, such as for great crested newts, dormice or bats; this should comprise the preconstruction/construction related elements of strategies only.

d) Work schedules for activities with specific timing requirements in order to avoid/reduce potential harm to ecological receptors; including details of when a licensed ecologist and/or ecological clerk of works (ECoW) shall be present on site.

e) Key personnel, responsibilities and contact details (including Site Manager and ecologist/ECoW).

f) Timeframe for provision of compliance report to the local planning authority; to be completed by the ecologist/ECoW and to include photographic evidence.

 

Development shall be carried out in strict accordance with the approved CEMP.

 

REASON: To ensure adequate protection and mitigation for ecological receptors prior to and during construction, and that works are undertaken in line with current best practice and industry standards and are supervised by a suitably licensed and competent professional ecological consultant where applicable.

 

12   Prior to the start of construction, a Landscape and Ecology Management Plan (LEMP) shall be submitted to and approved in writing by the Local Planning Authority. The LEMP shall include long term objectives and targets, management responsibilities and maintenance schedules for each ecological feature within the development, together with a mechanism for monitoring success of the management prescriptions, incorporating review and necessary adaptive management in order to attain targets.

 

The LEMP shall also include details of the legal and funding mechanism(s) by which long-term implementation of the plan will be secured. The LEMP shall be implemented in full and for the lifetime of the development in accordance with the approved details.

 

REASON: To ensure the long-term management of landscape and ecological features retained and created by the development, for the benefit of visual amenity and biodiversity for the lifetime of the scheme.

 

13   No development shall commence on site until an Air Quality Assessment (AQA) has been submitted to and approved in writing by the Local Planning Authority. The AQA must quantify the effect of the development on existing local authority air quality monitoring locations and sensitive receptors as well as the proposed development. It must also identify and make adjustments for all core strategy based development in the developments locality, including impact on residents of the proposed site from the nearby waste transfer station / composting facility from dust and odour. Use of CURED data in the AQA is expected along with any other currently accepted approaches to AQA. Any mitigation identified from the results of the assessment shall be incorporated into the final design of the proposed development. Development shall be carried out in accordance with the approved details.

 

REASON: In order to assess the impact of new development within an area subject to an air quality management area restriction, in the interests of the amenity of the area and the site itself and in the interests of protected species and their habitats.

 

14   No development shall commence on site until a scheme of Ultra Low Energy Vehicle infrastructure has been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details and thereafter be permanently retained.

 

REASON: Core Policy 55; Development proposals, which by virtue of their scale, nature or location are likely to exacerbate existing areas of poor air quality, will need to demonstrate that measures can be taken to effectively mitigate emission levels in order to protect public health, environmental quality and amenity.

 

15   No development shall commence until a Full Travel Plan has been submitted to and approved in writing by the Local Planning Authority. No part of the development shall be occupied prior to the implementation of the Travel Plan, (or implementation of those parts capable of being implemented prior to occupation). Those parts identified for implementation after occupation shall be implemented in accordance with the timetable contained therein, and shall continue to be implemented as long as any part of the development is occupied.

 

REASON: In the interests of reducing the amount of private car movements to and from the development site.

 

16   Prior to commencement of the development a Construction Traffic Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The Plan shall include details of construction vehicle routeing, construction staff vehicle parking areas within the site, local road cleaning, and measures to prevent excessive mud and dust being deposited on the public highway. The site construction shall be carried out in accordance with the approved plan.

 

REASON: In the interests of highway safety and road user convenience.

 

17   Prior to first occupation the two existing field gate access points to the development land shall have been properly and permanently closed in accordance with details to be first submitted to and approved in writing by the local Planning Authority.

 

REASON: In the interests of preventing indiscriminate use of inappropriate access points to the public highway.

 

18   No external lighting shall be installed on-site until plans showing the type of light appliance, the height and position of fitting, illumination levels and light spillage in accordance with the appropriate Environmental Zone standards set out by the Institution of Lighting Professionals in their publication “The Reduction of Obtrusive Light” Guidance Note 01/21 (reference GN01/21), have been submitted to and approved in writing by the Local Planning Authority. The approved lighting shall be installed and shall be maintained in accordance with the approved details and no additional external lighting shall be installed.

 

REASON: In the interests of the amenities of the area and to minimise unnecessary light spillage above and outside the development site.

 

19   No development shall take place above slab level until the exact details and samples of the materials to be used for the external walls and roofs have been submitted to and approved in writing by the Local Planning Authority. The use of local natural stone/ heritage clay brick (red, white-washed red and red with blue tones) / natural timber will be used for the facing walls / windows / doors in the detailed design of this scheme. Development shall be carried out in accordance with the approved details.

 

REASON: The matter is required to be agreed with the Local Planning Authority in order that the development is undertaken in an acceptable manner, in the interests of visual amenity and the character and appearance of the area and in order to secure a high quality of design to make a positive contribution to the site and its surroundings and show consideration for its local context. The appearance and treatment of the spaces between and around buildings is also of great importance.

 

20   All soft landscaping comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the first occupation of the building(s) or the completion of the development whichever is the sooner, or in accordance with a programme to be agreed in writing with the Local Planning Authority.

 

All shrubs, trees and hedge planting shall be maintained free from weeds and shall be protected from damage by vermin and stock. Any trees or plants which, within a period of five years, die, are removed, or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local planning authority.

 

All hard landscaping shall also be carried out in accordance with the approved details prior to the occupation of any part of the development or in accordance with a programme to be agreed in writing with the Local Planning Authority.

 

REASON: To ensure a satisfactory landscaped setting for the development and the protection of existing important landscape features and to ensure that the site is satisfactorily landscaped in order to support protected species and their habitats.

 

21   In terms of noise audible at any of the site boundaries, the hours of construction shall be restricted to the following times:-

Mondays - Fridays 08:00 – 18:00hrs

Saturdays 08:00 – 13:00hrs

Not at all on Sundays or Bank and Public Holidays

 

REASON: In the interests of the amenity of the area

 

22   No burning shall take place on site during the construction phase.

 

REASON: In the interests of the amenity of the area

 

23   Prior to first occupation the access, including the tactile lowered kerb crossing of Marshall Road just east of the vehicular access, shall have been provided, as detailed on plan number 41342/5501/SK01/F.

 

REASON: In the interests of safe and convenient access to the development.

 

24   Prior to occupation of the 100th dwelling the section of 3 metre wide footway on the A342 connecting into the development, and the associated tactile crossing of Marshall Road just west of the Marshall Road / A342 roundabout detailed on plan number 41342/5501/SK01/F shall all have been provided.

 

REASON: In the interests of safe and convenient pedestrian access to the development.

 

25   Prior to first occupation of the 50th dwelling the new south-east bound bus stop on the A342 as outlined on plan number 41342/5501/SK01/F, including high access kerbs, road markings and a new flag sign, shall all have been provided in accordance with details to be first submitted to and approved in writing by the Local Planning Authority.

 

REASON: In the interests of improved public transport accessibility.

 

26   Prior to first occupation of the 50th dwelling a new replacement bus shelter at the existing north-west bound bus layby on the A342, as outlined on plan number 41342/5501/SK01/F, including demolition and removal of the existing shelter, high access kerbs and a flag sign, shall have been provided in accordance with details to be first submitted to and approved in writing by the Local Planning Authority.

 

REASON: In the interests of improved public transport accessibility.

 

27   Prior to first occupation of the 100th dwelling the existing footway between the Sleight Lane / A342 junction and the existing north-west bound bus layby on the A342 shall have been widened to 2 metres and resurfaced in accordance with details to be first submitted to and approved in writing by the local Planning Authority.

 

REASON: In the interests of good pedestrian and public transport accessibility.

 

28   Prior to first occupation of the 100th dwelling the existing footway on the north-east side of the A342 shall have been widened to between 1 and 1.2 metres and resurfaced in tarmacadam, in accordance with details to be first submitted to and approved in writing by the Local Planning Authority.

 

REASON: In the interests of good pedestrian accessibility.

 

Informatives: (14)

29   The applicant is advised that the development hereby approved may represent chargeable development under the Community Infrastructure Levy Regulations 2010 (as amended) and Wiltshire Council's CIL Charging Schedule. If the development is determined to be liable for CIL, a Liability Notice will be issued notifying you of the amount of CIL payment due. If an Additional Information Form has not already been submitted, please submit it now so that we can determine the CIL liability. In addition, you may be able to claim exemption or relief, in which case, please submit the relevant form so that we can determine your eligibility. The CIL Commencement Notice and Assumption of Liability must be submitted to Wiltshire Council prior to commencement of development. Should development commence prior to the CIL Liability Notice being issued by the local planning authority, any CIL exemption or relief will not apply and full payment will be required in full and with immediate effect. Should you require further information or to download the CIL forms please refer to the Council's Website https://www.wiltshire.gov.uk/dmcommunityinfrastructurelevy.

 

30   Please note that Council offices do not have the facility to receive material samples. Please deliver material samples to site and inform the Planning Officer where they are to be found.

 

31   This permission shall be read in conjunction with an Agreement made under Section 106 of the Town and Country Planning Act, 1990 and dated the [INSERT].

32   The attention of the applicant is drawn to the contents of the letter from Wessex Water dated 12 August 2021.

 

33   The applicant should note that the costs of carrying out an archaeological investigation will fall to the applicant or their successors in title. The Local Planning Authority cannot be held responsible for any costs incurred.

 

34   The applicant should note that under the terms of the Wildlife and Countryside Act (1981) and the Habitats Regulations (2010) it is an offence to disturb or harm any protected species, or to damage or disturb their habitat or resting place. Please note that this consent does not override the statutory protection afforded to any such species. In the event that your proposals could potentially affect a protected species you should seek the advice of a suitably qualified and experienced ecologist and consider the need for a licence from Natural England prior to commencing works. Please see Natural England’s website for further information on protected species.

 

35   The consent hereby granted shall not be construed as authority to carry out works on the highway. The applicant is advised that a license may be required from Wiltshire’s Highway Authority before any works are carried out on any footway, footpath, carriageway, verge or other land forming part of the highway.

 

36   Informative: The presumed maximum site capacity has been agreed based on the indicative mix shown on Dwg 204: Sketch Masterplan Accommodation Schedule Overlay, which includes a significant number of open market apartments. If, at REM, a market housing mix should be proposed which instead includes a higher proportion of larger homes, then the final Amount may have to reduce in order that the quality of design is in accordance with the design philosophies described in the DAS (section 4).

 

37   Informative: The applicants attention is drawn to the Highways Authority requirements for the minimum car and cycle parking standards to be fully met at this location under any reserved matters application.

 

38   Informative: The reserved matters application should include a pedestrian access connection to Sleight Lane as indicated on the Sketch Masterplan number 4110/2/203/K.

 

39   Informative: The applicants attention is drawn to the requirement that at reserved matters stage a parallel road to A342 only separated by a hedgerow will not be accepted for highway safety reasons. The distance between the two roads and the landscaping will both need to be agreed with the relevant highways, landscape and ecological officers. 

40   Informative: It is noted that the applicant plans to discharge surface water flows to an existing Wessex Water sewer; this will be subject to separate applications under Section 104 of the Water Industry Act.

 

It is noted that the applicant plans to utilise blue-green SuDS features throughout the site, within “green corridors”, this is favourable and in line with the current guidance for major developments in the NPPF. The applicant should seek to maximise the use of blue-green SuDS features (such as swales, bioretention, ponds) in order to provide drainage with multi-faceted benefits of managing water quality & quantity, whilst improving biodiversity and amenity. It will be unacceptable to the LLFA for SuDS features to be omitted due to a lack of available space / costs; the applicant’s drainage engineer should work closely with the landscape architect and masterplanner to ensure that SuDS are incorporated into the detailed design proposals.

 

41   Land Drainage Informative: The Lead Local Flood Authority advises that as part of the reserved matters consent application the following drainage information will be required:

 

1. Based on the Wiltshire Council SFRA mopping, the site has been identified to be at moderate risk of groundwater flooding. This is supported by the ground conditions assessment which states that perched groundwater has been encountered at approx. 500mm below ground level on adjacent sites. It is noted that the applicant has conducted trial pits to 3.6m depth, and has not encountered groundwater, however in order to demonstrate that the risk of groundwater flooding has been fully managed (in accordance with Paragraph 160 of the NPPF), the applicant should undertake further groundwater monitoring in order to take account of seasonal variations in groundwater level.

2. It is noted that there is a low risk of contamination on site due to historic land use, which will be the subject of additional detailed ground investigations. The applicant will be required to design the proposed drainage system to account for contamination encountered in this investigation, to ensure that a pathway between pollutants and sensitive receptors is not created by the drainage design.

3. In accordance with the Sewerage Sector Guidance (paragraph C.3.12), the applicant is required to consider collection of surface water for re-use, or provide justification as to why it cannot be achieved on this site. This could include rainwater harvesting for greywater applications such as toilet flushing, and domestic water butts.

4. The applicant will be required to provide detailed hydraulic calculations as part of a Full / Reserved Matters Planning Application in order to demonstrate:

a. The 1 in 30 year rainfall event is contained within the drainage system without causing flooding to any part of the site.

b. The 1 in 100 year plus 40% climate change rainfall event does not cause flooding to any building (including a basement) or utility plant.

c. The site has been designed to ensure that flows in excess of the 1 in 100 year rainfall event are managed in exceedance routes that minimise the risks to people and property.

The calculations should set the MADD factor / additional storage value to 0m3/ha to prevent an over-estimation of attenuation storage available on site.

Due to the outfall to a Wessex Water sewer, the calculations should also be simulated with a surcharged outfall, to ensure that this does not cause flooding on site.

The drainage drawings should show the pipe / link & manhole / node numbers used in the calculations in order to link the drawing with the detailed calculations.

5. The applicant will be required to submit plans which demonstrate how exceedance flows in excess of the 1 in 100year rainfall (+40% climate change) will be safely managed on site in order to prevent an increase in flood risk to people or property.

6. The applicant should provide and operation and maintenance programme detailing the proposed ownership details of the drainage infrastructure and the responsibilities of all parties.

7. The applicant should provide a development management and construction phasing plan.

 

42   Landscape Informative: In order that the development is undertaken in an acceptable manner, to ensure a satisfactory landscaped setting for the development and the protection of existing important landscape features the scheme of hard and soft landscaping that is required to be submitted shall include (but not be restricted to): -

• location and current canopy spread of all existing trees and hedgerows on the land;

• full details of any to be retained, together with measures for their protection in the course of development;

• a detailed planting specification showing all plant species, supply and planting sizes and planting densities;

• finished levels and contours;

• means of enclosure, including details of all boundary treatments;

• car park layouts;

• other vehicle and pedestrian access and circulation areas;

• all hard and soft surfacing materials;

• minor artefacts and structures (e.g. furniture, play equipment, refuse and other storage units, signs, lighting etc);

• proposed and existing functional services above and below ground (e.g. drainage, power, communications, cables, pipelines etc indicating lines, manholes, supports etc);

• retained historic landscape features and proposed restoration, where relevant.

• additional trees, of a number, size and species and in a location to be agreed in writing with the Local Planning Authority, shall be planted in accordance with BS3936 (Parts 1 and 4), BS4043 and BS4428

• additional street trees shall be planted in double tree lines and shall be incorporated into appropriate width / volume planting beds to meet both highways and landscape requirements.

 

43   Informative: In the development of the details for the approval of reserved matters application the applicant is encouraged to engage with the Trust for Devizes pertaining to layout, identity and built form and encouraged to explore the possibility to include a cycleway pedestrian path along the former disused railway embankment.