Matthew Stephen encouraged that the original conditions applied to the consent be transferred to a new resolution.

 

The planning officer introduced the report which recommended that permission be granted, subject to the conditions in the report, as amended by the late observations. It was explained that the application had originally been to Committee in July 2014 however due to changes in National Planning Practice Guidance a Section106 legal agreement was no longer required and the application was to be re-determined.

 

There were no technical questions.

 

Members of the public then addressed the Committee as detailed above.

 

In the debate that followed, Members expressed support for the officer’s recommendation, and requested that the local member be advised of the amendment to condition 15. However, the Committee commented it was unfortunate that the community would lose the financial contributions.

 

Resolved:

 

To grant planning permission, subject to the following conditions:

 

1.    The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

REASON: To comply with the provisions of Section 91 of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004.

 

2.    No development shall commence on site until details and samples of the materials to be used for the external walls and roofs have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.

 

REASON: In the interests of visual amenity and the character and appearance of the area.

 

3.    No development shall commence on site until a scheme of hard and soft landscaping has been submitted to and approved in writing by the Local Planning Authority, the details of which shall include:

(a) indications of all existing trees and hedgerows on the land;

(b) details of any to be retained, together with measures for their protection in the course of development;

(c) hedgerows within or overhanging the site, in relation to the proposed buildings, roads, and other works;

(d) finished levels and contours;

(e) means of enclosure;

(f) hard surfacing materials;

 

REASON: To ensure a satisfactory landscaped setting for the development and the protection of existing important landscape features.

 

4.    All soft landscaping comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the first occupation of the building(s) or the completion of the development whichever is the sooner; All shrubs, trees and hedge planting shall be maintained free from weeds and shall be protected from damage by vermin and stock. Any trees or plants which, within a period of five years, die, are removed, or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local planning authority. All hard landscaping shall also be carried out in accordance with the approved details prior to the occupation of any part of the development or in accordance with a programme to be agreed in writing with the Local Planning Authority.

 

REASON: To ensure a satisfactory landscaped setting for the development and the protection of existing important landscape features.

 

5.    (a) No retained tree shall be cut down, uprooted or destroyed, nor shall any retained tree be topped or lopped other than in accordance with the approved plans and particulars, without the prior written approval of the Local Planning Authority. Any topping or lopping approved shall be carried out in accordance with British Standard 3998 (Tree Work).

 

(b) If any retained tree is removed, uprooted or destroyed or dies, another tree shall be planted at the same place and that tree shall be of such size and species and shall be planted at such time, as may be specified in writing by the Local Planning Authority.

 

(c) No equipment, machinery or materials shall be brought on to the site for the purpose of the development, until a scheme showing the exact position of protective fencing to enclose all retained trees beyond the outer edge of the overhang of their branches in accordance with British Standard 5837 (2005): Trees in Relation to Construction, has been submitted to and approved in writing by the Local Planning Authority, and; the protective fencing has been erected in accordance with the approved details. This fencing shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the prior written consent of the Local Planning Authority. In this condition “retained tree” means an existing tree which is to be retained in accordance with the approved plans and particulars; and paragraphs (a) and (b) above shall have effect until the expiration of five years from the first occupation or the completion of the development, whichever is the later.

 

REASON: To enable the Local Planning Authority to ensure the retention of trees on the site in the interests of visual amenity.

 

6.    The existing hedge between Nos 12 and 14 Bythebrook and the application site shall not be removed and shall be retained at a height of at least 3:00 metres. Should any section of the hedge be removed or die it shall be replaced with appropriate planting during the next planting season.

 

REASON: To preserve the visual amenity and privacy of the development.

 

7.    Prior to the commencement of development details of any proposed retaining walls to be built on the site shall be submitted to and approved in writing by the local planning authority and implemented and maintained strictly in accordance with the approved plans.

 

REASON: To safeguard the visual amenity of the area and in the interests of highways safety.

 

8.    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (as amended by the Town and Country Planning (General Permitted Development) (Amendment) (No.2) (England) Order 2008 (or any Order revoking or re-enacting or amending that Order with or without modification), the garage(s) hereby permitted shall not be converted to habitable accommodation.

 

REASON: To safeguard the amenities and character of the area and in the interest of highway safety.

 

9.    No part of the development hereby permitted shall be first brought into use/occupied until the access, turning area and parking spaces have been completed in accordance with the details shown on the approved plans. The areas shall be maintained for those purposes at all times thereafter.

 

REASON: In the interests of highway safety.

 

10.No development shall commence on site until a scheme for the discharge of surface water from the site (including surface water from the access/driveway), incorporating sustainable drainage details, has been submitted to and approved in writing by the Local Planning Authority. The development shall not be first occupied until surface water drainage has been constructed in accordance with the approved scheme.

 

REASON: To ensure that the development can be adequately drained.

 

11.The development hereby permitted shall be carried out in accordance with the approved Flood Risk assessment dated September 2012 by PBA and the following mitigation measures detailed in the FRA:

 

1.     Finished floor levels are set no lower than 68.25 above Ordnance Datum (AOD)

 

The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing/phasing arrangements embodied within the scheme.

 

REASON: To reduce the risk of flooding to the proposed development and future occupants.

 

12.No development shall commence on site until details of the works for the disposal of sewerage have been submitted to and approved in writing by the Local Planning Authority. No dwelling shall be first occupied until the approved sewerage details have been fully implemented in accordance with the approved plans.

 

REASON: To ensure that the proposal is provided with a satisfactory means of drainage.

 

13.The mitigation measures in paragraphs 5.4 and 5.6 of the approved Ecological Assessment prepared by BSG Ecology and received 8th May 2013 shall be carried out in full prior to the first occupation of the development and/or in accordance with the timetable detailed in the Ecological assessment.

 

REASON: To mitigate against the loss of existing biodiversity and natural habitats.

 

14.No development shall be undertaken within 8 metres of the bank of the Hardenhuish brook which would restrict access for the purposes of maintenance by the water authority.

 

REASON: To safeguard access for maintenance of the watercourse.

 

15.No development shall commence on site (including any works of demolition), until a Construction Method Statement, which shall include the following:

a) the parking of vehicles of site operatives and visitors;

b) loading and unloading of plant and materials;

c) storage of plant and materials used in constructing the development;

d) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;

e) wheel washing facilities;

f) measures to control the emission of dust and dirt during construction;

g) a scheme for recycling/disposing of waste resulting from demolition and construction works; and

h) measures for the protection of the natural environment

i) hours of construction, including deliveries;

j) construction traffic may only access the site from Old Hardenhuish Lane via the entrance to Sedgwick House;

 

has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The development shall not be carried out otherwise than in accordance with the approved construction method statement without the prior written permission of the Local Planning Authority.

 

REASON: To minimise detrimental effects to the neighbouring amenities, the amenities of the area in general, detriment to the natural environment through the risks of pollution and dangers to highway safety, during the construction phase.

 

16.Prior to the occupation of the development the proposed dwellings an area from which refuse bins can be collected shall be agreed in writing by the local planning authority.

 

REASON: In the interests of public and visual amenity.

 

17.Notwithstanding the submitted plans planning permission is not granted by this decision for the erection of gates at the proposed entrance to the site at Bythebrook.

 

REASON: In the interests of amenity and the appearance of the area.

 

18.The development hereby permitted shall be carried out in accordance with thefollowing approved plans:

Site Location plan

P538-01-01

Tree Survey

T12/0128/p/0014; T12/0128/p/01-0001 through T12/0128/p/01-000113

P538-01-03

P538-01-04

P538-01-05

P538-01-06

P538-01-07

P538-01-10

P538-01-13

P538-01-14

Design and Access Statement

All dated 22/5/13

P538-01-02A

P538-01-09A

P538-01-08A

All Dated 09/10/13

 

REASON: For the avoidance of doubt and in the interests of proper planning.

 

INFORMATIVES:-

1.    Any alterations to the approved plans, brought about by compliance with Building Regulations or any other reason must first be agreed in writing with the Local Planning Authority before commencement of work.

 

2.    The applicant should note that the grant of planning permission does not include any separate permission which may be needed to erect a structure in the vicinity of a public sewer. Such permission should be sought direct from Thames Water Utilities Ltd / Wessex Water Services Ltd. Buildings are not normally allowed within 3.0 metres of a Public Sewer although this may vary depending on the size, depth, strategic importance, available access and the ground conditions appertaining to the sewer in question.

 

3.    The applicant is requested to note that this permission does not affect any private property rights and therefore does not authorise the carrying out of any work on land outside their control. If such works are required it will be necessary for the applicant to obtain the landowners consent before such works commence. If you intend carrying out works in the vicinity of the site boundary, you are also advised that it may be expedient to seek your own advice with regard to the requirements of the Party Wall Act 1996.