19/06176/FUL - 34 Park Lane Salisbury

Minutes:

Public Participation

Mr Weaver spoke in objection to the application

Darryl Howell spoke in support of the application

Rodney Job spoke in support of the application

 

The Planning Team Leader Richard Hughes presented the application to demolish the existing bungalow and erection of 3 townhouses with a detached triple garage, associated parking and vehicular access (resubmission of 18/06402/FUL), at 34 Park Lane, Salisbury, as detailed in the report.

 

The Officer clarified that a response from Highways had been received, they had agreed the amended layout of parking, and requested a condition be applied.

 

The application was recommended for approval subject to conditions, as set out in the report.

 

It was noted that part of Park Lane had already been developed to the south.

 

The site had previously been given planning permission for the development of 2 bungalows with a garage. The application for consideration only related to the front of the site.

 

Issues raised with neighbouring amenity, relating to concerns over reduced daylight as a result of the development. The plan showed the proposed scheme would be positioned forward from the neighbouring property, with an element of single story at the rear.

 

There was already a block of flats adjacent to the site.

 

 An outline plan had previously been approved on the site. This scheme included a total of 9 parking spaces.

 

The Committee was then able to ask technical questions of the Officer, where it was clarified that the approximate height of the proposed development was relatively the same as what had been approved in the outline application. 

 

There was not a full list of proposed materials on the application, if desired by the Committee this could be included on the conditions. 

 

The existing flats position sat slightly in front of the proposed development, with the neighbouring house sat slightly further back in a stepped style along the row.

 

Members of the Public were then given the opportunity to present their views as indicated above. The main points raised included that the development would impact on the levels of light received by neighbouring house and would there would be an element of overlooking.

 

 

The previously approved Outline consent had not indicated the height of the previous scheme. The new scheme was considered to be overdevelopment for the size of this site, as the footprint was 20% larger.

 

The development would provide three family homes which would be highly sustainable and have access to local amenity. The Outline permission was for a block of 4 flats. The style of the new scheme had a Georgian influence and would complement other properties in Park Lane.

 

The scheme had the support of the Tree Officer.

 

The overlooking from the townhouses would be minimised by the use of oblique glass in the windows.

 

This scheme was superior in design than the previous outline application. 

 

The Division Member Cllr Mary Douglas then spoke on the application noting that she had called the application in to enable a full debate at Committee. 

 

The number of beds in the outline application was much lower than the new scheme. When I tried to compare the footprint it was difficult to make a clear judgement on what the differences were, due to the quality of the plans.

 

Yes we need more housing and yes this is sustainable, but if you look at Park Lane, when you go from Stratford Road there was a higher density of housing at one end. Did we want to increase the density of housing in this area also?

 

It was hard to see how this development would not change the character of this part of Park Lane.

 

Cllr Douglas did not ask the Committee to vote in one way or the other, but asked for it to be debated.

 

The Committee agreed that the poor quality of the plans provided were difficult to decipher. The Chairman asked the Planning Officer to clarify some of the details from the plans shown on the slides at the meeting.

 

Cllr Westmoreland then moved the motion of approval in line with Officer recommendation. This was seconded by Cllr Hewitt.

 

A debate followed where the key points raised included that Outline planning permission had already been granted for a block of four flats. The new scheme was more favourable.

 

The scheme was of a classic Victorian design so in-keeping with the properties in the area. The trees were also protected.

 

The Committee then voted on the motion of approval in line with Officer recommendations.

 

Resolved:

That application 19/06176/FUL be approved with conditions:

 

Conditions:

 

1

The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

REASON:   To comply with the provisions of Section 91 of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004.

 

2

No development shall commence on site until the exact details and samples of the materials to be used for the external walls and roofs have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.

 

REASON: In the interests of visual amenity and the character and appearance of the area

 

3

No railings, fences, gates, walls, bollards and other means of enclosure development shall be erected in connection with the development hereby permitted until details of their design, external appearance and decorative finish have been submitted to and approved in writing by the Local Planning Authority.  Development shall be carried out in accordance with the approved details prior to the development being occupied / brought into use.

 

REASON:  In the interests of visual amenity and the character and appearance of the area.

 

4

No development shall commence on site until a scheme of hard and soft landscaping has been submitted to and approved in writing by the Local Planning Authority, the details of which shall include:

 

location and current canopy spread of all existing trees and hedgerows on the land;

full details of any to be retained, together with measures for their protection in the course of development;

a detailed planting specification showing all plant species, supply and planting sizes and planting densities;

finished levels and contours;

means of enclosure;

car park layouts;

         

 

REASON: The matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to ensure a satisfactory landscaped setting for the development and the protection of existing important landscape features.

 

5

No demolition, site clearance or development shall commence on site, and; no equipment, machinery or materials shall be brought on to site for the purpose of development, until a Tree Protection Plan showing the exact position of each          tree/s and their protective fencing in accordance with British Standard 5837: 2012: "Trees in Relation to Design, Demolition and Construction -Recommendations"; has been submitted to and approved in writing by the Local Planning Authority, and;

 

The protective fencing shall be erected in accordance with the approved details. The protective fencing shall remain in place for the entire development phase and until all equipment, machinery and surplus materials have been removed from the site. Such fencing shall not be removed or breached during construction operations.

 

No retained tree/s shall be cut down, uprooted or destroyed, nor shall any retained tree/s be topped or lopped other than in accordance with the approved plans and particulars. Any topping or lopping approval shall be carried out in accordance British Standard 3998: 2010 "Tree Work - Recommendations" or arboricultural techniques where it can be demonstrated to be in the interest of good arboricultural practise.

 

If any retained tree is removed, uprooted, destroyed or dies, another tree shall be planted at the same place, at a size and species and planted at such time, that must be agreed in writing with the Local Planning Authority.

 

No fires shall be lit within 15 metres of the furthest extent of the canopy of any retained trees or hedgerows or adjoining land and no concrete, oil, cement, bitumen or other chemicals shall be mixed or stored within 10 metres of the trunk of any tree or group of trees to be retained on the site or adjoining land.

 

REASON: In the interests of visual amenity

 

6

No part of the development hereby permitted shall be brought into use/occupied until the access, turning area and parking spaces have been completed in accordance with the details shown on the approved plans. The areas shall be maintained for those purposes at all times thereafter.

 

REASON: In the interests of highway safety.

 

7

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England)Order 2015  (or any Order revoking or re-enacting or amending those Orders with or without modification), no development within Part 1, Classes A-H shall take place on the dwellinghouse(s) hereby permitted or within their curtilage.

 

REASON:  In the interests of the amenity of the area and to enable the Local Planning Authority to consider individually whether planning permission should be granted for additions, extensions or enlargements.

 

8

Before the development hereby permitted is first occupied/brought into use the roof window(s) in the east elevation(s) of the accommodation hereby permitted shall be glazed with obscure glass only [to an obscurity level of no less than level 5] and the windows shall be maintained with obscure glazing in perpetuity. No other windows, other than those hereby approved, shall be inserted in the east facing elevation of the accommodation hereby permitted.

 

REASON:  In the interests of residential amenity and privacy.

 

9

The development hereby permitted shall be carried out in accordance with the following approved plans:

 

Site works layout - drawing SW3 REV A

Street scene drawing SS1 REV A

Revised garage detail drawing GD3

Revised elevations drawing SK6

 

REASON: For the avoidance of doubt and in the interests of proper planning.

 

10

 

 

 

 

 

 

 

 

 

 

11

The demolition and construction works hereby permitted shall only take place between the hours of 0800 hrs and 1800hrs from Mondays to Fridays and between 0800hrs and 1300 hrs on Saturdays.  There shall be no construction works at any time on Sundays and Bank or Public Holidays, except for the internal fitting out works.

 

REASON:  To ensure the creation/retention of an environment free from intrusive levels of noise and activity in the interests of the amenity of the area.

 

 

No development shall commence on site with respect to this planning permission (including any works of demolition), until a Construction Method Statement, which shall include the following: 

 

a)       the parking of vehicles of site operatives and visitors;

b)       loading and unloading of plant and materials;

c)       storage of plant and materials used in constructing the     

           development;

d)       the erection and maintenance of security hoarding including   

           decorative displays and facilities for public viewing, where

           appropriate;

e)       wheel washing facilities;

f)        measures to control the emission of dust and dirt during

           construction;

g)       a scheme for recycling/disposing of waste resulting from

           demolition and construction works; and

h)       measures for the protection of the natural environment.

i)        hours of construction, including deliveries;

 

has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be complied with in full throughout the construction period. The development shall not be carried out otherwise than in accordance with the approved construction method statement.

 

REASON: To minimise detrimental effects to the neighbouring amenities, the amenities of the area in general, detriment to the natural environment through the risks of pollution and dangers to highway safety, during the construction phase

 

 

 

 

 

 

 