Demolition of existing buildings (comprising 85 Care bedrooms), and proposed partial redevelopment and erection of new buildings to provide 71 Extra Care units and associated communal facilities (Use Class C2), parking and landscaping.
Minutes:
Public Participation
Ms Fleur Hitchcock, local resident, spoke in objection to the application.
Mr Philip Haile, local resident, spoke in objection to the application.
Mr Guy Flintoft, applicant, spoke in support of the application.
Mr Patrick Clark, adviser to the applicant, spoke in support of the application.
Mr Michael Ross, Chairman of the Avonpark Residents Committee, spoke in support of the application.
Cllr Graham Bostock, on behalf of Winsley Parish Council, spoke in objection to the application.
The Senior Planning Officer, Steven Sims, presented a report which recommended approval for the demolition of existing buildings (comprising of 85 Care Bedrooms), and the proposed partial redevelopment and erection of new buildings to provide 71 Extra Care Units, associated communal facilities (Use Class C2), parking, and landscaping.
It was highlighted that Members of the Committee had undertaken a site visit on Wednesday 1 May 2024.
Key material considerations were identified, including the principle of development; Wiltshire’s 5-year housing land supply; viability; impact on the openness of the Green Belt; impact on the character of the area/Cotswold’s National Landscape/public footpaths; impact on the living conditions of neighbouring residents; and ecology, highway, and drainage issues. It was also noted that the proposal is not regarded as “major development” for the purposes of interpreting paragraph 183 to the NPPF. Also in the presentation, it was confirmed that officers are concluding that the site is regarded as previously developed land and would not have a greater impact on the openness of the green belt, thereby constituting an exception as set out in paragraph 154(g) to the NPPF.
Attention was then drawn to some late alterations to the wording of Condition 2 (the approved plans condition which appeared on page 92 of the published agenda) which reflected minor changes to plan drawing references.
Members of the Committee then had the opportunity to ask technical questions to the officer. Clarity was sought on the age limits of future residents, the operating hours of construction vehicles, as well as the effects of this development on the residual housing needs.
Members raised further queries about the potential impacts on the amenities of existing occupants, neighbouring residents, the increase to the height of the buildings, and the landscape and character of the area.
It was noted that Members were disappointed that a Council Highways Officer was not able to attend the meeting and further clarification was sought on the suggested highways and access improvements. In response, it was emphasised that the access plan was indicative only, and planning conditions would secure the necessary detailed highway works as well as a Construction Management Plan – which would need to be approved by the Council prior to works commencing.
The Committee was informed that there were no technical objections in relation to highways, drainage, landscape impacts or urban design matters.
The named public speakers as detailed above, then had the opportunity to present their views to the Committee.
Councillor Johnny Kidney, as the Local Unitary Member, then spoke to the application with particular weight being afforded to protecting the Green Belt, concerns being expressed about the proposed height and lighting implications to the immediate and wider landscape as well as effects on neighbouring residents.
A debate then followed where Members acknowledged the concerns raised by local residents and discussed issues including the impacts on the Green Belt/National Landscape, the redevelopment of brownfield land, the age group of the future occupants and associated restrictions, visibility and road safety concerns in relation to the access route, and light pollution.
Members then sought further clarity from officers on the application satisfying the NPPF with regard to the Green Belt tests.
Officers responded by advising that the test required a planning judgement to be made on the proposed new build and essentially be tested against para 154 criterion g – which allows limited infilling or the partial or complete redevelopment of previously developed land whether redundant or in continuing use, so long as it would not have a greater impact on the openness of the Green Belt.
Members were informed that officers did not consider the application proposal to warrant a refusal based on harm to the Green Belt as they felt there were cumulative very special circumstances to justify a grant of planning permission for the reasons as set out within the committee report.
Following the debate, Councillor Trevor Carbin moved to endorse the officer’s recommendation, seconded by Councillor Ernie Clark, with amendments being made to planning condition 12 relating to light spillage mitigation, and adding a planning informative to capture the Committee’s concern relating to the existing speed limit along the B3108 near to the site and weight limit.
It was then:
Resolved:
The Committee APPROVED the application in accordance with officer recommendations subject to the following altered and additional conditions and informative.
1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
REASON: To comply with the provisions of Section 91 of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004.
2. The development hereby permitted shall be carried out in accordance with the following approved plans:
Existing Block Plan scale 1:500 drg no. BA9516-2001
Proposed Block Plan scale 1:500 drg no. BA9516 2101
Existing Site Plan scale 1:500 drg no. BA9516-2002
Proposed Site Plan scale 1:500 drg no. BA9516-2102 rev B
Existing Location Plan scale 1:1250 drg no. BA9516-2000
Proposed Location Plan scale 1:1250 drg no. BA9516-2100
Proposed External Plant drg no. BA9516-2151
Kingfisher Court – Proposed Plans scale 1:200 drg no. BA9516-2160
Proposed Bat Tower drg no. BA9516-2150
Bay Study Alexnader Hall drg no. BA9516-2143
Bay Study Building A drg no. BA9516-2141
Bay Study Building B drg no. BA9516-2142 rev A
Bay Study Alexander Hall – Entrance drg no. BA9516-2144
Proposed Ground Floor Plan drg no. scale 1:200 drg no. BA9516-2110
Proposed First Floor Plan drg no. scale 1:200 drg no. BA9516-2111
Proposed Second Floor Plan drg no. scale 1:200 drg no. BA9516-2112
Proposed Third Floor Plan drg no. scale 1:200 drg no. BA9516-2113
Proposed Fourth Floor Plan drg no. scale 1:200 drg no. BA9516-2114 rev A
Proposed Roof Plan scale 1:200 drg no. BA9516-2115 rev B
Proposed Elevations Alexander House scale 1:100 drg no. BA9516-2132
Proposed Elevations – Block A scale 1:100 drg no. BA9516-2133 rev A
Proposed Elevations – Block B scale 1:100 drg no. BA9516-2134 rev A
Proposed sectional elevations 1 of 2 scale 1:250 drg no. BA9516-2130 rev A
Proposed sectional elevations 2 of 2 scale 1:250 drg no. BA9516-2131 rev B
Demolition Plans scale 1:500 drg no. BA9516-2030
Demolition Elevations scale 1:250 drg no. BA9516-2031
Proposed Parking Plan scale 1:500 drg no. BA9516-2171
Waste Strategy scale 1:500 drg no. BA9516-2170
Post Development BNG Plan ref 1519-EcIA-F4 Rev 1
Ecological Mitigation and Enhancement ref 1519-EcIA-F5
Landscape General Arrangement Overview scale 1:500 drg no. BR-LD-100 Rev C
Landscape General Arrangement Layout Sheet scale 1:400 drg no. BR-LD-101 Rev C
Landscape General Arrangement Sheet 1 scale 1:200 drg no BL-LD-102 Rev C
Landscape General Arrangement Sheet 2 scale 1:200 drg no BL-LD-103 Rev C
Landscape Proposals., Planting Plans, Plant Schedule scale 1:500 drg no. BL-LD-200 Rev B
Landscape Planting Proposals Sheets 1 to 5 (Sheet 1 drg no. BL-LD-201 Rev B, Sheet 2 drg no. BL-LD-202 Rev B, Sheet 3 drg no. BL-LD-203 Rev B, Sheet 4 drg no. BL-LD-204 Rev B, Sheet 5 drg no. BL-LD-205 Rev B)
Energy and Sustainability Statement dated Aug 2023 by Hoare Lea
Design and Access Statement dated Aug 2023 rev A by PRP
Shadow Habitats Regulations Assessment dated Dec 2023 by GE Consulting ref 1519-sHRA-LT-REV1
Lighting Design dated Jan 2024 by Hoare Lea
Baseline Lighting Survey dated Aug 2023 by Hoare Lea
Environmental Lighting dated Jan 2024 by Hoare Lea
Ecological Impact Assessment Lighting dated Jan 2024 by GE Consulting Rev 3
Ecological Addendum Note dated Oct 2023 by GE Consulting
Phase I and II Geoenvironmental Report Addendum note dated Aug 2023
Arboricultural Impact Assessment dated Aug 2023 by GE Consulting
Landscape, Visual & Green Belt Impact Assessment dated Aug 2023 by Stantec UK Ltd
Phase I and II Geoenvironmental Report
Environmental Noise Survey dated Aug 2023 by Hoare Lea Rev 02
Transport Assessment Part 1 and 2 dated Aug 2023 by Pater Evan Partnership
Heritage Statement dated Aug 2023 by Stantec UK Ltd
Specialist Housing Need Report dated Aug 2023 by Stantec UK Ltd
Odour Technical Note dated Aug 2023 by Hoare Lea
REASON: For the avoidance of doubt and in the interests of proper planning.
3. The buildings hereby approved shall be used for Use Class C2 (residential institution and care home) and for no other purpose (including any other purpose in Class C2 of the Schedule to the Town and Country Planning (Use Classes) Order 1987 (as amended) (or in any provisions equivalent to that class in any statutory instrument revoking or re-enacting that Order with or without modification).
REASON: The proposed use is acceptable, but the Local Planning Authority would wish to consider any future proposal for a change of use having regard to the circumstances of the case.
4. Bat roosts and bat access points shall be incorporated into the development in accordance with:
• Proposed Bat Tower. Ref: BA9516-2150 dated August 2023 by PRP.
• Figure 5: Bat Mitigation and Enhancement. Ref: 1519-EcIA-F5 Rev 1 dated December 2023 by GE Consulting.
• Proposed Elevations – Block A. Ref: BA9516-2133 Rev A dated July 2023 by PRP.
• Page 17 of Ecological Impact Assessment. Ref: 1519-EcIA-LT-REV3 dated January 2024 by GE Consulting.
or as otherwise specified in a relevant European Protected Species Licence superseding this permission. The installation of these bat roosts and access features will be supervised by a professional ecologist and this part of the condition will be discharged when photographic evidence of installed features have been submitted to and approved in writing b the Local Planning Authority. These bat roosts and access points will continue to be available for bats for the lifetime of the development.
REASON: To mitigate for impacts to bats arising from the development.
5. All soft landscaping comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the first occupation of the buildings or the completion of the development whichever is the sooner; All shrubs, trees and hedge planting shall be maintained free from weeds and shall be protected from damage by vermin and stock. Any trees or plants which, within a period of five years, die, are removed, or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local planning authority. All hard landscaping shall also be carried out in accordance with the approved details prior to the occupation of any part of the development or in accordance with a programme to be agreed in writing with the Local Planning Authority.
REASON: To ensure a satisfactory landscaped setting for the development and the protection of existing important landscape features.
6. The external artificial lighting shall be installed in strict accordance with the submitted documents. No additional external light fixtures shall be installed unless details of proposed new lighting have been submitted to and approved by the Local Planning Authority in writing. The submitted details must demonstrate how the proposed lighting would impact on bat habitat / ecological interest compared to the pre-existing situation.
REASON: To avoid illumination of habitat used by bats.
7. Prior to the commencement of works on site, including demolition, ground works/excavation, site clearance, vegetation clearance and boundary treatment works, a Construction Environmental Management Plan (CEMP) shall be submitted to the local planning authority for approval in writing. The Plan shall provide details of the avoidance, mitigation and protective measures to be implemented before and during the construction phase, including but not necessarily limited to, the following:
• Identification of ecological protection areas/buffer zones and tree root protection areas and details of physical means of protection, e.g. exclusion fencing.
• Working method statements for protected/priority species, such as bats, to be implemented during the demolition phase.
• Working method statements for protected/priority species to be implemented during the construction phase.
• Work schedules for activities with specific timing requirements in order to avoid/reduce potential harm to ecological receptors; including details of when a licensed ecologist, and/or an ecological clerk of works (ECoW) shall be present on site.
• Key personnel, responsibilities and contact details (including Site Manager and ecologist/ECoW).
Development shall be carried out in strict accordance with the approved CEMP.
REASON: To ensure adequate protection and mitigation for ecological receptors prior to and during construction, and that works are undertaken in line with current best practice and industry standards and are supervised by a suitably licensed and competent professional ecological consultant where applicable.
8. Prior to the commencement of works on site, a Landscape and Ecology Management Plan (LEMP) shall be submitted to and approved in writing by the Local Planning Authority. The LEMP will include:
• Long term objectives and targets in accordance with the Biodiversity Metric 4.0 Calculation Tool – Rev 2.
• Management responsibilities and maintenance schedules for each ecological feature within the development as identified in the Biodiversity Metric 4.0 Calculation Tool – Rev 2 and the Landscape Proposals.
• The mechanism for monitoring success of the management prescriptions with reference to the appropriate Biodiversity Metric target Condition Assessment Sheet(s).
• Maintenance schedules for features such as bird and bat boxes, hedgehog domes and habitat piles.
• A procedure for review and necessary adaptive management in order to attain targets.
• Details of the legal and funding mechanism(s) by which long-term implementation of the plan will be secured.
The LEMP shall be implemented in full and for the lifetime of the development in accordance with the approved details.
REASON: To ensure the long-term management of landscape and ecological features retained and created by the development, for the benefit of visual amenity and biodiversity for the lifetime of the scheme.
9. Prior to the commencement of works on site, an investigation of the history and current condition of the site to determine the likelihood of the existence of contamination arising from previous uses (including asbestos) has been carried out and all of the following steps have been complied with to the satisfaction of the Local Planning Authority:
Step (i) A written report has been submitted to and approved by the Local Planning Authority which shall include details of the previous uses of the site and any adjacent sites for at least the last 100 years and a description of the current condition of the sites with regard to any activities that may have caused contamination. The report shall confirm whether or not it is likely that contamination may be present on the site and the potential impact of any adjacent sites.
Step (ii) If the above report indicates that contamination may be present on, under or potentially affecting the proposed development site from adjacent land, or if evidence of contamination is found, a more detailed site investigation and risk assessment should be carried out in accordance with DEFRA and Environment Agency’s “LCRM” and other authoritative guidance and a report detailing the site investigation and risk assessment shall be submitted to and approved in writing by the Local Planning Authority.
Step (iii) If the report submitted pursuant to step (i) or (ii) indicates that remedial works are required, full details must be submitted to the Local Planning Authority and approved in writing and thereafter implemented prior to the commencement of the development or in accordance with a timetable that has been agreed in writing by the Local Planning Authority as part of the approved remediation scheme. On completion of any required remedial works the applicant shall provide written confirmation to the Local Planning Authority that the works have been completed in accordance with the agreed remediation strategy.
REASON: In order that the development is undertaken in an acceptable manner and to ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
10. No development shall commence on site until a Construction Management Plan (CMP) has been submitted to and approved in writing by the Local Planning Authority. The plan shall include details of the measures that will be taken to reduce and manage the emission of noise, vibration and dust during the demolition and/or construction phase of the development. It shall include details of the following:
• The movement of construction vehicles
• The cutting or other processing of building materials on site
• Wheel washing and vehicle wash down facilities
• The transportation and storage of waste and building materials
• The recycling of waste materials
• The loading and unloading of equipment and materials
• The location and use of generators and temporary site accommodation
• Where piling is required, this must be Continuous flight auger piling wherever practicable to minimise impacts
• Hours of construction
The construction/demolition phase of the development will be carried out fully in accordance with the construction management plan at all times.
REASON: In order that the development is undertaken in an acceptable manner and to minimise detrimental effects to the neighbouring amenities, the amenities of the area in general, detriment to the natural environment through the risks of pollution and dangers to highway safety, during the construction phase.
11.No works shall extend above slab level for the new buildings hereby approved until details and samples of the materials to be used for the external walls and roofs have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.
REASON: In the interests of visual amenity and the character and appearance of the area.
12.Prior to any occupation of the new buildings hereby approved, full details of the mitigation measures to reduce light spillage (including, but not exclusively limited to, use of reduced light spill glass / black out blinds and curtains) from buildings Block A and Block B, shall be submitted to and approved in writing by the Local Planning Authority, The approved measures shall therefore be maintained at all times thereafter in accordance with the approved details.
REASON: In the interests of the amenities of the area and to minimise unnecessary light spillage above and outside the development site and to minimise the impact of the development on existing biodiversity and nature habitats.
13.No part of the development hereby permitted shall be first brought into use until the access or turning areas & parking spaces have been completed in accordance with the details shown on the approved plans. The areas shall always be maintained for those purposes thereafter.
REASON: In the interests of highway safety.
14.No part of the development hereby permitted shall be first brought into use until details of the proposed highway works at the access, including the proposed informal pedestrian crossing on the B3108 and details of the proposed bus shelter, along with a timetable for its delivery have been submitted to and approved in writing by the Local Planning Authority. Thereafter, the above works shall be delivered in accordance with the approved details.
REASON: In the interests of highway safety.
15.The development hereby approved shall not be brought into use until a scheme for the discharge of surface water from the site, incorporating sustainable drainage details together with permeability test results to BRE365, and an updated drainage strategy that details the implementation, maintenance and management of the sustainable drainage scheme, including infiltration details of the site, has been submitted to and approved in writing by the Local Planning Authority. The development shall not be first occupied until surface water drainage has been constructed in accordance with the approved scheme.
REASON: In order that the development is undertaken in an acceptable manner, to ensure that the development can be adequately drained.
16.In the event that any contamination on the site is encountered at any time when carrying out the approved development, the Local Planning Authority must be advised of the steps that will be taken by an appropriate contractor; to deal with contamination and provide a written remedial statement to be followed be a written verification report that confirms what works that have been undertaken to render the development suitable for use.
REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
17.The hereby approved C2 development shall be constructed to meet, as a minimum, the higher Building Regulations standard Part G for water consumption limited to 110 litres per person per day using the fittings approach as per the commitment in the Energy and Sustainability Statement dated August 2023 by Hoare Lea.
REASON: The site is in an area of serious water stress requiring water efficiency opportunities to be maximised, to mitigate the impacts of climate change, in the interests of sustainability and to use natural resources prudently in accordance with the National Planning Policy Framework.
18.The additional extra care units permitted by this development shall be occupied only by persons of at least 55 years of age (“a Primary Resident”) and a spouse, or partner of such a person, irrespective of the age of such spouse or partner. In the event any Primary Resident in occupation of one of the additional extra care units dies or vacates such a unit, the spouse or partner of such a Primary Resident shall be entitled to remain within the unit, irrespective of whether they satisfy the age restriction.
REASON: The residential units have been designed for occupation by persons who satisfy the above criteria and are unsuitable for family housing.
INFORMATIVES:
1) The applicant is advised that the development hereby approved may represent chargeable development under the Community Infrastructure Levy Regulations 2010 (as amended) and Wiltshire Council's CIL Charging Schedule. If the development is determined to be liable for CIL, a Liability Notice will be issued notifying you of the amount of CIL payment due. If an Additional Information Form has not already been submitted, please submit it now so that we can determine the CIL liability. In addition, you may be able to claim exemption or relief, in which case, please submit the relevant form so that we can determine your eligibility. The CIL Commencement Notice and Assumption of Liability must be submitted to Wiltshire Council prior to commencement of development. Should development commence prior to the CIL Liability Notice being issued by the local planning authority, any CIL exemption or relief will not apply and full payment will be required in full and with immediate effect. Should you require further information or to download the CIL forms please refer to the Council's Website:
www.wiltshire.gov.uk/planninganddevelopment/planningpolicy/communityinfrastructurelevy
2) The developer/applicant will be required to enter into a S278 Highways Agreement with the Local Highway Authority, to include funding of the new cantilever bus shelter, before the commencement of any of the identified highway works.
3) Roosting bats have been confirmed in Alexander Heights and Alexander Hall. Under the Conservation of Habitats and Species Regulations 2017 (as amended), it is an offence to harm or disturb bats or damage or destroy their roosts. Planning permission for development does not provide a defence against prosecution?under this legislation. The applicant is advised that a European Protected Species Licence will be required before any work is undertaken to implement this planning permission. Future conversion of the roof space to living accommodation or replacing the roof could also breach this legislation and specialist advice should be obtained from a professional bat ecologist before proceeding with work of this nature.
4) The applicant should note that under the terms of the Wildlife and Countryside Act 1981 (as amended) and the Habitats Regulations 2017 (as amended) it is an offence to disturb or harm any protected species including for example, breeding birds and reptiles. The protection offered to some species such as bats, extends beyond the individual animals to the places they use for shelter or resting. Please note that this consent does not override the statutory protection afforded to any such species. In the event that your proposals could potentially affect a protected species you should seek the advice of a suitably qualified and experienced ecologist and consider the need for a licence from Natural England prior to commencing works.?Please see Natural England’s website for further information on protected species.
5) Please be advised that nothing in this permission shall authorise the diversion, obstruction, or stopping up of any right of way that crosses the site.
6) The applicant’s attention is drawn to the Western Area Planning Committees’ concerns regarding the current speed limit (50mph) and vehicle weight limit along the B3108 and, in particular, visibility and highway safety issues at the access to the development site. The Western Area Planning Committee would like the applicant to wherever possible assist the Council in its efforts to improve the safety of the B3108 to the benefit of the residents on the Avonpark site, as well as the wider local community.
A break was then taken from 17.10pm to 17.15pm.