Agenda item

16/03515/OUT- Langley Park, Chippenham, Wiltshire, SN15 1GE- Outline Application for the demolition of existing buildings and redevelopment to provide up to 400 units (C3); a 69 bed hotel (C1) with cafe (A3) up to 199 sqm; a discount foodstore (A1) of up to 1,741 sqm; B1, B2 & B8 floorspace (up to 13,656 sqm) and highway improvements to the Little George and the B4069/Pew Hill junctions with all matters (except access) reserved.

A report by the Case Officer is attached.

Minutes:

The following people spoke against the proposal:

 

Mr Michael Bryant, representing Eagle Retail

Ms Kirsten Wilson, a local resident

 

The following person spoke in support of the proposal:

 

Mr Clive Wilding, Property Director, Langley Properties

 

The Committee received a presentation by the Case Officer which set out the main issues in respect of the application, with a recommendation that planning permission be granted, subject to the completion of a Section 106 legal agreement and the imposition of appropriate conditions within six months of the date of this Committee decision.

 

In the event of failure to complete, sign and seal the required Section 106 agreement within the defined timeframe to then delegate authority to the Head of Development Management to refuse planning permission.

 

The Case Officer also brought to the attention of the Committee late representations received.

 

Members then had the opportunity to ask technical questions after which they received statements from members of the public as detailed above, expressing their views regarding the proposal.

 

Members then heard the views of Cllr Chris Caswill, the local Member, in which he generally welcomed and supported the application but did express some concerns as follows:-

 

·                The need to recognise the costs involved in dealing with a huge amount of contamination at the sight.

·                Concerns of local residents at the increased amount of traffic resulting from the opening up of Hawthorn Road.

·                The need for a residents’ parking scheme at Langley Park and to request the developer to make a contribution towards this scheme.

·                Disappointment at the failure to secure a contribution towards the provision of a third left at Chippenham railway station for those members of the public who were unable to access the railway bridge from Langley Park.

 

After some discussion,

 

Resolved:

 

To authorise the Head of Development Management to grant planning permission, subject to the completion of a Section 106 legal agreement and the imposition of the following conditions within six months of the date of the resolution of this Committee.

 

 

 

In the event of failure to complete, sign and seal the required section 106 agreement within the defined timeframe to then delegate authority to the Area Development Manager to refuse planning permission for the following reason:-

 

The application proposal fails to provide and secure the necessary and required Services and infrastructure supporting the proposed residential development including Affordable Housing; Waste; Air Quality Management and is therefore contrary to Policies CP3 CP43 & CP55 of the Wiltshire Core Strategy Adopted January 2015 and Paras 7, 14 & 17 of the National Planning Policy Framework March 2012.

 

Conditions

 

1

The development hereby permitted shall be begun either before the expiration of three years from the date of this permission, or before the expiration of two years from the date of approval of the last of the reserved matters to be approved, whichever is the later.

 

REASON:   To comply with the provisions of Section 92 of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004.

 

 

2

No development shall commence on site until details of the following matters (in respect of which approval is expressly reserved) have been submitted to, and approved in writing by, the Local Planning Authority:

(a)       The scale of the development;

(b)       The layout of the development;

(c)       The external appearance of the development;

(d)       The landscaping of the site;

The development shall be carried out in accordance with the approved details.

REASON:  The application was made for outline planning permission and is granted to comply with the provisions of Section 92 of the Town and Country Planning Act 1990 and Article 5 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015.

3

An application for the approval of all of the reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission.

REASON:  To comply with the provisions of Section 92 of the Town and Country Planning Act 1990.

4

Prior to the commencement of the development a phasing plan shall be submitted to and approved by the local planning authority. The phasing plan shall identify, amongst other things, at what stage during the proposed road alterations at the Langley Road site access, the realignment of Foundry Lane, the provision of the link road (between Langley Road and the realigned Foundry Lane) and the improvement of the Little George junction will be secured, as well as access to individual units of development.

REASON; In order to ensure that all parts of the development are afforded reasonable access to the local road network, and that a choice of access is available at an early stage.

5

The development hereby permitted shall be carried out in broad accordance with the details shown on the approved plans and documents as listed below:

LP-01 H

MP-01 Z

PMP-01 C

PMP-02 G

PMP-03 F

PMP-04 J

PMP-05 J

PMP-06 C

PMP-07 D

PMP-09 B

Design and Access Statement- July 2016

REASON: to ensure the development is carried out in accordance with the approved plans.

6

The internal floor area of the discount food store shall be no greater than 1,741sqm with the net sales area no greater than 1,254 square metres.

There shall be no more than 400 residential units (C3)

There shall be no more than 13,565m² new employment (B1/ B2/B8) floor space;

The Café (A3) shall have gross floorspace of not more than 199m²;

The hotel (C1) shall have no more than 69-bedrooms;

REASON: For the avoidance of doubt and in the interest of proper planning.

7

The landscaping scheme(s) for each phase of the development , as required by condition 2, the shall include:-

o location and current canopy spread of all existing trees and hedgerows on the land;

o details of any  trees or hedgerows to be retained, together with measures for their protection in the course of development;

o a detailed planting specification showing all plant species, supply and planting   sizes and planting densities;

o finished levels and contours;

o means of enclosure;

o car park layouts;

o all hard and soft surfacing materials;

o minor artefacts and structures (e.g. furniture, play equipment, refuse and other storage units, signs, lighting etc);

o proposed and existing functional services above and below ground (e.g. drainage, power, communications, cables, pipelines etc indicating lines, manholes, supports etc);

o retained historic landscape features and proposed restoration, where relevant.

The above details shall be provided prior to the buildings in that phase of the development being brought into use

REASON: To ensure a satisfactory landscaped setting for the development and the protection of existing important landscape features.

8

No development shall commence on site until a scheme of phasing of landscaping has been approved in writing by the Local Planning Authority.  The landscaping shall be carried out in the first planting and seeding season following occupation of the building(s) or the completion of the development, whichever is the sooner within that particular phase; any trees or plants which within a period of five years, die, are removed, or become seriously damaged or diseased, shall be replaced in the next planting season with others of a similar size and species.

REASON: The application contained insufficient information to enable this matter to be considered prior to granting planning permission and the matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to ensure a satisfactory landscaped setting for the development.

9

The detailed landscaping plans to be submitted pursuant to condition no. 4 shall include a plan at not less than 1:200 scale, showing the position of any trees proposed to be retained and the positions and routes of all proposed and existing pipes, drains, sewers, and public services, including gas, electricity, telephone and water. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order, 1995 (or of any Order revoking and re-enacting or amending that Order with or without modification), no services shall be dug or laid into the ground other than in accordance with the approved details.

REASON: To ensure the retention of trees on the site in the interests of visual amenity.

10

No retained tree shall be cut down, uprooted or destroyed, nor shall any retained tree be pruned in any manner, be it branches, stems or roots, other than in accordance with the approved plans and particulars , without the prior written approval of the Local Planning Authority. All tree works should be carried out in accordance with BS5837:2005 (Recommendations for Tree Work).

REASON: For the avoidance of doubt and to ensure the satisfactory appearance of the development.

 

11

No phase of development shall be occupied or bought into use until a scheme for the provision of adequate water supplies and fire hydrants, necessary for fire fighting purposes within that phase, has been submitted to, and approved in writing by, the Local Planning Authority. That phase of development shall not then be occupied or bought into use until the scheme has been implemented.

REASON: To ensure that satisfactory fire fighting facilities are incorporated into the site.

12

No phase of development shall commence, until a Construction Method Statement for that phase has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period of that Phase.

The Statement shall provide for:

i. the parking of vehicles of site operatives and visitors;

ii. loading and unloading of plant and materials;

iii. storage of plant and materials used in constructing the development;

iv. the erection and maintenance of security hoarding including decorative

displays and facilities for public viewing, where appropriate;

v. wheel cleaning facilities;

vi. measures to control the emission of dust and dirt during construction;

vii. a scheme for recycling/disposing of waste resulting from demolition and

construction works;

viii. measures to control noise during construction;

ix. a signage strategy for construction traffic.

REASON: In the interests of highway safety and the amenity of local residents.

13

No phase of development shall commence on site until a scheme for the discharge of foul water from the site, including any on/off site improvements to provide capacity to serve the site and allowing clearances to existing sewers or diversions, has been submitted to and approved in writing by the Local Planning Authority.

No building within the phase of development shall be first occupied until foul water drainage has been constructed in accordance with the approved scheme.

REASON: To ensure that the development can be adequately drained

 

14

No phase of development shall commence on site until a scheme for the discharge of surface water from the site (including surface water from the access / driveway), incorporating sustainable drainage details together with permeability test results to BRE365; full details of attenuation including ownership and maintenance regimes to ensure that not increase  (and preferably a decrease) in current storm water flows to public storm sewers and removing current storm to foul connections has been submitted to and approved in writing by the Local Planning Authority. 

That phase of development shall not be first occupied until surface water drainage has been constructed in accordance with the approved scheme.

REASON: To ensure that the development can be adequately drained.

15

No development shall commence on site (other than that required to be carried out as part of a scheme of remediation approved by the Local Planning Authority under this condition), until steps (i) to (iii) below have been fully complied with. If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the Local Planning Authority in writing until step (iv) has been complied with in full in relation to that contamination.

 

Step (i) Site Characterisation:

 

An investigation and risk assessment must be completed to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings submitted to and approved in writing by the Local Planning Authority. The report of the findings must include:

- A survey of the extent, nature and scale of contamination on site;

- The collection and interpretation of relevant information to form a conceptual model of the site, and a preliminary risk assessment of all the likely pollutant linkages;

- If the preliminary risk assessment identifies any potentially significant pollutant linkages a ground investigation shall be carried out, to provide further information on the location, type and concentration of contaminants in the soil and groundwater and other characteristics that can influence the behaviour of the contaminants;

- An assessment of the potential risks to:

 

• human health,

• property (existing or proposed) including buildings, crops,

livestock, pets, woodland and service lines and pipes,

• adjoining land,

• groundwater and surface waters,

• ecological systems,

• archaeological sites and ancient monuments;

 

This must be conducted in accordance with DEFRA and the Environment Agency’s “Model Procedures for the Management of Land Contamination, CLR 11” and other authoritative guidance.

 

Step (ii) Submission of Remediation Scheme:

 

If any unacceptable risks are identified as a result of the investigation and assessment referred to in step (i) above, a detailed remediation scheme to bring the site to a condition suitable for the intended use must be prepared. This should detail the works required to remove any unacceptable risks to human health, buildings and other property and the natural and historical environment, should be submitted to and approved in writing by the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, a timetable of works and site management procedures.

 

Step (iii) Implementation of Approved Remediation Scheme:

 

The approved remediation scheme under step (ii) must be carried out in accordance with its requirements. The Local Planning Authority must be given at least two weeks written notification of commencement of the remediation scheme works.

Step (iv) Reporting of Unexpected Contamination:

In the event that contamination is found at any time when carrying out the approved development that was not previously identified it should be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment should be undertaken in accordance with the requirements of step (i) above and where remediation is necessary, a remediation scheme should be prepared in accordance with the requirements of step (ii) and submitted to and approved in writing by the Local Planning Authority.

 

Step (v) Verification of remedial works:

 

Following completion of measures identified in the approved remediation scheme a verification report should be submitted to the Local Planning Authority. The report should demonstrate the effectiveness of the remedial works.

A statement should also be provided by the developer which is signed by a person who is competent to confirm that the works detailed in the approved scheme have been carried out (The Local Planning Authority can provide a draft Remediation Certificate when the details of the remediation scheme have been approved at stage (ii) above).

 

The verification report and signed statement should be submitted to and approved in writing of the Local Planning Authority.

 

Step (vi) Long Term Monitoring and Maintenance:

 

If a monitoring and maintenance scheme is required as part of the approved remediation scheme, reports must be prepared and submitted to the Local Planning Authority for approval at the relevant stages in the development process as approved by the Local Planning Authority in the scheme approved pursuant to step (ii) above, until all the remediation objectives in that scheme have been achieved.

 

All works must be conducted in accordance with DEFRA and the Environment Agency’s “Model Procedures for the Management of Land Contamination, CLR 11” and other authoritative guidance.

 

REASON: The application contained insufficient information to enable this matter to be considered prior to granting planning permission and the matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.

16

Prior to the commencement of development of the foodstore (A1) a scheme of external lighting, including the measures to be taken to minimise sky glow, glare and light trespass, shall be submitted to and approved in writing by the Local Planning Authority.  The external lighting scheme shall be designed so as to meet the criteria for Environmental Zone E3 as defined by the Institute of Lighting Professionals 'Guidance Notes for the Reduction of Obtrusive Light' 2012. The approved scheme shall be implemented before the development is first brought into use and shall be maintained in effective working order at all times thereafter.

REASON: To limit the impact of the development on adjacent residential amenity

 

17

(i) No deliveries shall be made to or collections made from the development hereby approved except between the hours of 06:00am and 22:00pm Monday to Saturday and 07:00am and 17:00pm on Sundays.

(ii)There shall be no use of reverse beepers on delivery or collection vehicles between 06:00am and 07:00am Monday to Saturday and between 07:00am and 09:00am on Sundays. All deliveries between these approved hours shall be direct via the loading and unloading dock shown on the approved plans.

REASON: To limit the impact of the development on adjacent residential amenity and prevent undue disturbance

18

The foodstore (A1) unit hereby permitted shall not be open to the public except between the hours of 08:00am to 22:00pm on Monday to Saturday, 09:00am to 18:00pm on Sunday & Public Holidays.

REASON: To limit the impact of the development on residential amenity.

19

No development of the foodstore (A1) shall take place until full details of all proposed fixed plant installed on the building and/or site (and including all mitigation measures screening) has been submitted to and agreed in writing by the Local Planning Authority. Such details shall include confirmation that the plant will not exceed -5dB below the lowest background noise level and that noise rating not exceed 37dB when measured at the nearest residential properties. Development shall be carried out in complete accordance with such details so agreed.

REASON: To limit the impact of the development on residential amenity.

20

The foodstore shall not commence development until details of secure covered cycle parking for both customers and staff have been submitted to and approved in writing by the Local Planning Authority. These facilities shall be provided in accordance with the approved details and made available for use prior to the first occupation of the development hereby permitted and thereafter retained.

REASON: In the interest of highway safety and to promote alternative and sustainable transport.

 

21

The foodstore (a1) shall not be opened for trade until the car park circulatory aisles, the car parking spaces, the disabled spaces and the parent and child spaces have been provided, surfaced and marked out in accordance with the a parking plan that shall be submitted to and approved in writing by the Local Planning Authority. These vehicle parking spaces shall thereafter be retained for their designated users.

REASON: In the interest of highway safety and to ensure that sufficent off street parking is provided.

22

The Foodstore shall not open for trade until a Green Travel Plan relating to the Foodstore has been submitted to and approved in writing by the Local Planning Authority. The Travel Plan shall include details of implementation and monitoring and shall be implemented in accordance with these agreed details. The results of the implementation and monitoring shall be made available to the Local Planning Authority on request, together with any changes to the plan arising from those results.

REASON: In the interests of road safety and reducing vehicular traffic to the development

23

Development of the Foodstore shall not commence until details of the provision for the loading and unloading of goods vehicles servicing the Foodstore have been submitted to and approved in writing by the Local Planning Authority. The Foodstore shall not be first brought into use until such provision has been made. This space shall be maintained for such purpose at all times thereafter.

REASON: To ensure that adequate provision is made for loading/unloading within the site in the interests of highway safety.

24

Development of the Foodstore shall not commence until details of the estate roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients and drive gradients car associated with the Foodstore including the timetable for provision of such works, have been submitted to and approved by the Local Planning Authority. The Foodstore shall not be first brought into use until the estate roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients and drive gradients, associated with the Foodstore have all been constructed and laid out in accordance with the approved details.

REASON: To ensure that the roads are laid out and constructed in a satisfactory manner.

25

Development of the Foodstore (A1) shall not commence on site until details of the design, external appearance and decorative finish of all railings, fences, gates, walls, bollards and other means of enclosure associated with the Foodstore have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details prior to the Foodstore brought into use.

REASON: In the interests of visual amenity and the character and appearance of the area.

26

Development of the Foodstore shall not commence on site until details and samples of the materials to be used for the external walls and roofs of the foodstore  within that phase have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.

REASON: In the interests of visual amenity and the character and appearance of the area.

27

No development of a residential phase shall commence until details and samples of the materials to be used for the external walls and roofs of dwellings within that phase have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.

REASON: In the interests of visual amenity and the character and appearance of the area.

28

Prior to the commencement of  development of the residential units details of the design, external appearance and decorative finish of all railings, fences, gates, walls, bollards and other means of enclosure within that phase have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details prior to any dwellings within the phase being occupied

REASON: In the interests of visual amenity and the character and appearance of the area.

29

Prior to the commencement of the residential phase of development details of the estate roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients, drive gradients, car parking and street furniture, including the timetable for provision of such works, relating to that phase have been submitted to and approved by the Local Planning Authority.

No phase of residential development shall be first occupied until the estate roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients, drive gradients, car parking and street furniture associated with that phase have all been constructed and laid out in accordance with the approved details.

REASON: To ensure that the roads are laid out and constructed in a satisfactory manner.

 

30

No dwelling in a residential phase shall be occupied until a Green Travel Plan addressing that phase of residential development has been submitted to and approved in writing by the Local Planning Authority. The Travel Plan shall include details of implementation and monitoring and shall be implemented in accordance with these agreed details. The results of the implementation and monitoring shall be made available to the Local Planning Authority on request, together with any changes to the plan arising from those results.

REASON: In the interests of road safety and reducing vehicular traffic to the development.

31

Development of the Hotel shall not commence on site until details and samples of the materials to be used for the external walls and roofs of the Hotel within that phase have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.

REASON: In the interests of visual amenity and the character and appearance of the area.

32

Development of the Hotel shall not commence until details of the estate roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients, drive gradients and car parking, associated with the Hotel including the timetable for provision of such works, have been submitted to and approved by the Local Planning Authority. The Hotel shall not be first brought into use until the estate roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients, drive gradients, and car parking associated with the Hotel have all been constructed and laid out in accordance with the approved details.

REASON: To ensure that the roads are laid out and constructed in a satisfactory manner.

33

Development of the Hotel shall not commence until details of the provision for the loading and unloading of goods vehicles servicing the Hotel have been submitted to and approved in writing by the Local Planning Authority. The Hotel shall not be first brought into use until such provision has been made. This space shall be maintained for such purpose at all times thereafter.

REASON: To ensure that adequate provision is made for loading/unloading within the site in the interests of highway safety.

34

The Hotel shall not be opened for trade until a Green Travel Plan relating to the Hotel has been submitted to and approved in writing by the Local Planning Authority. The Travel Plan shall include details of implementation and monitoring and shall be implemented in accordance with these agreed details. The results of the implementation and monitoring shall be made available to the Local Planning Authority on request, together with any changes to the plan arising from those results.

REASON: In the interests of road safety and reducing vehicular traffic to the development.

35

Prior to the commencement of development of the Hotel a scheme of external lighting, including the measures to be taken to minimise sky glow, glare and light trespass, shall be submitted to and approved in writing by the Local Planning Authority.  The external lighting scheme shall be designed so as to meet the criteria for Environmental Zone E3 as defined by the Institute of Lighting Professionals 'Guidance Notes for the Reduction of Obtrusive Light' 2012. The approved scheme shall be implemented before the development is first brought into use and shall be maintained in effective working order at all times thereafter.

REASON: To limit the impact of the development on adjacent residential amenity

36

No development of the Hotel shall take place until full details of all proposed fixed plant installed on the building and/or site (and including all mitigation measures screening) has been submitted to and agreed in writing by the Local Planning Authority. Such details shall include confirmation that the plant will not exceed -5dB below the lowest background noise level and that noise rating not exceed 37dB when measured at the nearest residential properties. Development shall be carried out in complete accordance with such details so agreed.

REASON: To limit the impact of the development on residential amenity.

37

The Hotel shall not be opened for trade until the car park circulatory aisles and the car parking spaces  have been provided, surfaced and marked out in accordance with the a parking plan that shall be submitted to and approved in writing by the Local Planning Authority. These vehicle parking spaces shall thereafter be retained

Reason: In the interest of Highway Safety.

38

The Hotel shall not be opened for trade until a Green Travel Plan relating to the Hotel has been submitted to and approved in writing by the Local Planning Authority. The Travel Plan shall include details of implementation and monitoring and shall be implemented in accordance with these agreed details. The results of the implementation and monitoring shall be made available to the Local Planning Authority on request, together with any changes to the plan arising from those results.

REASON: In the interests of road safety and reducing vehicular traffic to the  development.

39

Development of the B1, B2 & B8 floorspace shall not commence on site until details and samples of the materials to be used for the external walls and roofs of buildings within that phase have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.

REASON: To ensure the satisfactory appearance of the development

 

40

Development of the B1, B2 & B8 floorspace shall not commence until details of the design, external appearance and decorative finish of all railings, fences, gates, walls, bollards and other means of enclosure associated with the of the B1, B2 & B8 floorspace have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details prior to the development being brought into use.

REASON: In the interests of visual amenity and the character and appearance of the area.

41

Development of the Development of the B1, B2 & B8 floorspace shall not commence until details of the estate roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients, drive gradients and car parking, associated with the Development of the B1, B2 & B8 floorspace including the timetable for provision of such works, have been submitted to and approved by the Local Planning Authority. The Development of the B1, B2 & B8 floorspace shall not be first brought into use until the estate roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients, drive gradients, and car parking associated with the Development of the B1, B2 & B8 floorspace have all been constructed and laid out in accordance with the approved details.

REASON: To ensure that the roads are laid out and constructed in a satisfactory manner.

42

Prior to the commencement of development of the B1, B2 & B8 floor space  a scheme of external lighting, including the measures to be taken to minimise sky glow, glare and light trespass, shall be submitted to and approved in writing by the Local Planning Authority.  The external lighting scheme shall be designed so as to meet the criteria for Environmental Zone E3 as defined by the Institute of Lighting Professionals 'Guidance Notes for the Reduction of Obtrusive Light' 2012. The approved scheme shall be implemented before the development is first brought into use and shall be maintained in effective working order at all times thereafter.

REASON: To limit the impact of the development on adjacent residential amenity.

43

Development of the Development of the B1, B2 & B8 floorspace shall not commence until details of the estate roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients, drive gradients and car parking, associated with the Development of the B1, B2 & B8 floorspace including the timetable for provision of such works, have been submitted to and approved by the Local Planning Authority. The Development of the B1, B2 & B8 floorspace shall not be first brought into use until the estate roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients, drive gradients, and car parking associated with the Development of the B1, B2 & B8 floorspace have all been constructed and laid out in accordance with the approved details.

REASON: To ensure that the roads are laid out and constructed in a satisfactory manner.

44

Development of the B1, B2 & B8 floorspace shall not commence until details of the provision for the loading and unloading of goods vehicles servicing the B1, B2 & B8 floorspace have been submitted to and approved in writing by the Local Planning Authority. The B1, B2 & B8 floorspace shall not be first brought into use until such provision has been made. This space shall be maintained for such purpose at all times thereafter.

REASON: To ensure that adequate provision is made for loading/unloading within the site in the interests of highway safety.

45

Only B1(b) and (c) (Research & Development and light industry), B2 & B8 land uses as defined by the Town and Country Planning (Use Classes ) Order 1987 shall be permitted.

REASON: To ensure trip generation levels are within the realm of those identified in the TA and considered for SRN traffic impact

46

Prior to the occupation of any dwellings on the site, access for pedestrian and cycle users between the site and Tugela Road and Hawthorn Road shall be provided in accordance with details which shall first have been submitted to and approved by the local planning authority. The details for Hawthorn Road shall include for the provision of a vehicle turning facility at the end of the existing road, and shall show measures to restrict movement of motorised vehicles to or from the development site. The works shall be undertaken in accordance with the approved details.

REASON: In the interests of sustainable transport, and to secure direct links to the site from adjacent land.

47

The detailed layout shall make provision to accommodate a landing ramp for a bridge for non motorised users crossing between the site and the south side of the railway. The design shall identify the route which potential future users of the bridge may use as a right of way between the prospectively maintainable highway and the bridge.

REASON: In order to secure a future sustainable transport route via the site to the south side of the railway.

48

Except where otherwise agreed by the local planning authority, car parking provision shall be in accordance with the minimum standards set out in Wiltshire Council's Car Parking Strategy for all new dwellings provided on the site, and in accordance with the Strategy's maximum car parking standards, adjusted in accordance with the provisions of the Strategy, for all other land uses on the site hereby permitted

REASON: To ensure adequate provision of car parking space is made for residential development on the site, and to ensure that over-provision is not made for traffic attracting land uses other than residential.

 

 

 

 

 

 

 

Supporting documents: