Browse

Agenda item

16/04961/OUT Land at Arms Farm, High St, Chippenham, Sutton Benger, SN15 4RE

Minutes:

Ian Pople spoke in support of the application.

 

Eileen Warren and David Ratcliffe spoke in objection to the application

 

Cllr Norman Davis, Sutton Benger Parish Council, spoke in objection to the application.

 

The planning officer introduced the application which was for the construction of up to 14 dwellings; the application sought only outline planning permission, with all matters reserved. The officer recommended that planning permission be granted, subject to the signing of a section 106 agreement and conditions and informatives outlined in the report. Attention was drawn to the late observations. It was noted that residents had requested the application be deferred; however officer advised sufficient detail had been submitted to proceed to determination. The Committee was reminded the application had been reduced from previous proposals for 28 dwellings on the site. An indicative layout of the site in respect of access arrangement and location of dwellings was presented, however members were reminded they were not asked to consider such matters at this stage, these issues would be addressed at reserved matters stage in the event of outline planning permission being granted.

 

Photographs of the site were shown and details of nearby extant planning permission were given. The officer acknowledged that there would be some harm to the setting of the listed building at Arms Farm as a result of the development, however considered this would be outweighed by the benefits of the scheme.

 

In response to technical questions the officer advised that the parish council had not been asked to form a judgement on the access arrangements on site, this was not part of the application for outline permission. It was noted that the Conservation Officer’s response to the proposal had been published and the parish council was entitled to form a separate view on the impact of the development on the listed building, independent of the comments of the conservation officer. It was confirmed that the listed farm building would still have an outlook into an open field as a result of the development and that if access was taken from the B4069, as shown on the indicative layout, there would be some harm to the setting of the listed building. It was suggested that cart/bump stones be installed at frequent intervals along the rear of the byres in order to protect the structure if the track was created.  On balance, the planning officer considered the harm that would result from a new track, and the alterations associated with it, would be less than the harm that would occur if the access route were to be through the middle of the farmyard. It was explained that the harm would be outweighed by the public benefits of the scheme.

 

 

Members of the public then addressed the Committee as detailed above.

 

In response to statements from the public, the planning officer verified that proposed planning conditions would cover archaeological matters. It was acknowledged that there may be a need to remove a small part of the listed building as a result of the development, however the conservation officer had identified that this was a modern addition and deemed that on balance, this was not significant and therefore acceptable.

 

The local member, Cllr Greenman, spoke on the application and noted it was a more modest proposal than previous applications which had appeared before the Committee.

 

In the debate that followed, members were disappointed that a full planning application had not been submitted and it was commented that, at a reserved matters stage, they would prefer to see alternative access arrangements to those proposed on the indicative layout, preferably through the adjourning estate. Councillors sympathised with the concerns of the village however were not opposed to the principle of development on the site given material considerations as set out in the report.

 

Cllr Hutton, seconded by Cllr Trotman, moved the officer recommendation.

 

Resolved:

 

That authority is delegated to the Head of Development Management to GRANT planning permission, subject to conditions listed below and completion of a S106 legal agreement within six months of the date of the resolution of this Committee.

 

In the event of failure to complete, sign and seal the required section 106 agreement within the defined timeframe to then delegate authority to the Head of Development Management to REFUSE planning permission for the following reason:-

 

The application proposal fails to provide and secure the necessary and required Services and infrastructure supporting the proposed residential development including Affordable Housing, Waste and Education and is therefore contrary to Policies CP3 & CP43 of the Wiltshire Core Strategy Adopted January 2015 and Paras 7, 14 & 17 of the National Planning Policy Framework March 2012.

 

Planning conditions:

 

1.     The development hereby permitted shall be begun either before the expiration of three years from the date of this permission, or before the expiration of two years from the date of approval of the last of the reserved matters to be approved, whichever is the later.

 

REASON: To comply with the provisions of Section 92 of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004.

 

2.     No development shall commence on site until details of the following matters (in respect of which approval is expressly reserved) have been submitted to, and approved in writing by, the Local Planning Authority:

(a) The scale of the development;

(b) The layout of the development;

(c) The external appearance of the development;

(d) The landscaping of the site;

(e) The means of access to the site.The development shall be carried out in accordance with the approved details.

 

REASON: The application was made for outline planning permission and is granted to comply with the provisions of Section 92 of the Town and Country Planning Act 1990 and Article 5 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015.

 

3.     An application for the approval of all of the reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission.

 

REASON: To comply with the provisions of Section 92 of the Town and Country Planning Act 1990.

 

4.     All soft landscaping comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the first occupation of the building(s) or the completion of the development whichever is the sooner; All shrubs, trees and hedge planting shall be maintained free from weeds and shall be protected from damage by vermin and stock. Any trees or plants which, within a period of five years, die, are removed, or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless otherwise agreed in writing by the local planning authority. All hard landscaping shall also be  carried out in accordance with the approved details prior to the occupation of any part of the development or in accordance with a programme to be agreed in writing with the Local Planning Authority.

 

REASON: To ensure a satisfactory landscaped setting for the development and the protection of existing important landscape features.

 

5.     No demolition, site clearance or development shall commence on site, and; no equipment, machinery or materials shall be brought on to site for the purpose of development, until a Tree Protection Plan showing the exact position of each tree/s and their protective fencing in accordance with British Standard 5837: 2012: "Trees in Relation to Design, Demolition and Construction -Recommendations"; has been submitted to and approved in writing by the Local Planning Authority, and; The protective fencing shall be erected in accordance with the approved details. The protective fencing shall remain in place for the entire development phase and until all equipment, machinery and surplus materials have been removed from the site. Such fencing shall not be removed or breached during construction operations. No retained tree/s shall be cut down, uprooted or destroyed, nor shall any retained tree/s be topped or lopped other than in accordance with the approved plans and particulars. Any topping or lopping approval shall be carried out in accordance British Standard 3998: 2010 "Tree Work - Recommendations" or arboricultural techniques where it can be demonstrated to be in the interest of good arboricultural practise. If any retained tree is removed, uprooted, destroyed or dies, another tree shall be planted at the same place, at a size and species and planted at such time, that must be agreed in writing with the Local Planning Authority. No fires shall be lit within 15 metres of the furthest extent of the canopy of any retained trees or hedgerows or adjoining land and no concrete, oil, cement, bitumen or other chemicals shall be mixed or stored within 10 metres of the trunk of any tree or group of trees to be retained on the site or adjoining land. [In this condition "retained tree" means an existing tree which is to be retained in accordance with the approved plans and particulars; and paragraphs above shall have effect until the expiration of five years

 

REASON: To ensure that the proposed development does not result in the unnecessary loss of trees and existing screening, and for the avoidance of doubt.

 

6.     No part of the development hereby permitted shall be occupied until the access, turning area and parking spaces have been completed in accordance with the details shown on the approved plans. The areas shall be maintained for those purposes at all times thereafter.

 

REASON: In the interests of highway safety.

 

7.     No development shall commence on site until a scheme for the discharge of surface water from the site (including surface water from the access/driveway), incorporating sustainable drainage details, has been submitted to and approved in writing by the Local Planning Authority. The development shall not be occupied until surface water drainage has been constructed in accordance with the approved scheme.

 

REASON: The application contained insufficient information to enable this matter to be considered prior to granting planning permission and the matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to ensure that the development can be adequately drained.

 

8.     No development shall commence on site until details of the works for the disposal of sewerage including the point of connection to the existing public sewer have been submitted to and approved in writing by the Local Planning Authority. No dwelling shall be first occupied until the approved sewerage details have been fully implemented in accordance with the approved plans.

 

REASON: The application contained insufficient information to enable this matter to be considered prior to granting planning permission and the matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to ensure that the proposal is provided with a satisfactory means of drainage and does not increase the risk of flooding or pose a risk to public health or the environment.

 

9.     The dwellings hereby approved shall achieve a level of energy performance at or equivalent to Level 4 of the Code for Sustainable Homes. No dwelling shall be occupied until evidence has been issued and submitted to, and approved in writing by, the local planning authority certifying that this level or equivalent has been achieved.

 

REASON: To ensure that the objectives of sustainable development equal or equivalent to those set out in Policy CP41 of the Wiltshire Core Strategy are achieved.

 

10.The development hereby permitted shall be carried out in accordance with the following approved plans: EDP 2335/46

 

REASON: For the avoidance of doubt and in the interests of proper planning.

 

11.No development shall commence on site (including any works of demolition), until a Construction Method Statement, which shall include the following:

 

a) the parking of vehicles of site operatives and visitors;

b) loading and unloading of plant and materials;

c) storage of plant and materials used in constructing the development;

d) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;

e) wheel washing facilities;

f) measures to control the emission of dust and dirt during construction;

g) a scheme for recycling/disposing of waste resulting from demolition and construction works; and

h) measures for the protection of the natural environment.

i) hours of construction, including deliveries;

 

has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be complied with in full throughout the construction period. The development shall not be carried out otherwise than in accordance with the approved construction method statement.

 

REASON: The application contained insufficient information to enable this matter to be considered prior to granting planning permission and the matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to minimise detrimental effects to the neighbouring amenities, the amenities of the area in general, detriment to the natural environment through the risks of pollution and dangers to highway safety, during the construction phase.

 

12. No development shall commence until:

a) A written programme of archaeological investigation, which should include onsite work and off-site work such as the analysis, publishing and archiving of the results, has been submitted to and approved by the Local Planning Authority; and

b) The approved programme of archaeological work has been carried out in accordance with the approved details.

 

REASON: The application contained insufficient information to enable this matter to be considered prior to granting planning permission and/or [DELETE as appropriate] the matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to enable the recording of any matters of archaeological interest.

 

13.No development shall commence on site (other than that required to be carried out as part of a scheme of remediation approved by the Local Planning Authority under this condition), until steps (i) to (iii) below have been fully complied with. If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the Local Planning Authority in writing until step (iv) has been complied with in full in relation to that contamination.

 

Step (i) Site Characterisation:

An investigation and risk assessment must be completed to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings submitted to and approved in writing by the Local Planning Authority. The report of the findings must include:

- A survey of the extent, nature and scale of contamination on site;

- The collection and interpretation of relevant information to form a conceptual model of the site, and a preliminary risk assessment of all the likely pollutant linkages;

- If the preliminary risk assessment identifies any potentially significant pollutant linkages a ground investigation shall be carried out, to provide further information on the location, type and concentration of contaminants in the soil and groundwater and other characteristics that can influence the behaviour of the contaminants;

- An assessment of the potential risks to:

human health,

property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes,

adjoining land,

groundwater and surface waters,

ecological systems,

archaeological sites and ancient monuments;

 

This must be conducted in accordance with DEFRA and the Environment Agency’s “Model Procedures for the Management of Land Contamination, CLR 11” and other authoritative guidance.

 

Step (ii) Submission of Remediation Scheme:

If any unacceptable risks are identified as a result of the investigation and assessment referred to in step (i) above, a detailed remediation scheme to bring the site to condition suitable for the intended use must be prepared. This should detail the works required to remove any unacceptable risks to human health, buildings and other property and the natural and historical environment, should be submitted to and approved in writing by the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, a timetable of works and site management procedures.

 

Step (iii) Implementation of Approved Remediation Scheme:

The approved remediation scheme under step (ii) must be carried out in accordance with its requirements. The Local Planning Authority must be given at least two weeks written notification of commencement of the remediation scheme works.

 

Step (iv) Reporting of Unexpected Contamination:

In the event that contamination is found at any time when carrying out the approved development that was not previously identified it should be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment should be undertaken in accordance with the requirements of step (i) above and where remediation is necessary, a remediation scheme should be prepared in accordance with the requirements of step (ii) and submitted to and approved in writing by the Local Planning Authority.

 

Step (v) Verification of remedial works:

Following completion of measures identified in the approved remediation scheme a verification report should be submitted to the Local Planning Authority. The report should demonstrate the effectiveness of the remedial works. A statement should also be provided by the developer which is signed by a person who is competent to confirm that the works detailed in the approved scheme have been carried out (The Local Planning Authority can provide a draft Remediation Certificate when the details of the remediation scheme have been approved at stage (ii) above).

 

The verification report and signed statement should be submitted to and approved in writing of the Local Planning Authority.

 

Step (vi) Long Term Monitoring and Maintenance:

If a monitoring and maintenance scheme is required as part of the approved remediation scheme, reports must be prepared and submitted to the Local Planning Authority for approval at the relevant stages in the development process as approved by the Local Planning Authority in the scheme approved pursuant to step (ii) above, until all the remediation objectives in that scheme have been achieved.

 

All works must be conducted in accordance with DEFRA and the Environment Agency’s “Model Procedures for the Management of Land Contamination, CLR 11” and other authoritative guidance.

 

REASON: The application contained insufficient information to enable this matter to be considered prior to granting planning permission and the matter is required to be agreed with the Local Planning Authority before development commences in order that

the development is undertaken in an acceptable manner, to ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.

 

14.No development shall commence on site until the exact details and samples of the materials to be used for the external walls and roofs have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.

 

REASON: The application contained insufficient information to enable this matter to be considered prior to granting planning permission and the matter is required to be agreed with the Local Planning Authority before development commences in order that

the development is undertaken in an acceptable manner, in the interests of visual amenity and the character and appearance of the area

 

15.No railings, fences, gates, walls, bollards and other means of enclosure development shall be erected in connection with the development hereby permitted until details of their design, external appearance and decorative finish have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details prior to the development being occupied.

 

REASON: In the interests of visual amenity and the character and appearance of the area.

 

16.No development shall commence on site until details of the estate roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients, drive gradients, car parking and street furniture, including the timetable for provision of such works, have been submitted to and approved by the Local Planning Authority. The development shall not be first occupied until the estate roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining walls, service routes, surface water outfall, vehicle overhang margins, embankments, visibility splays, accesses, carriageway gradients, drive gradients, car parking and street furniture have all been constructed and laid out in accordance with the approved details.

 

REASON: The application contained insufficient information to enable this matter to be considered prior to granting planning permission and the matter is required to be agreed with the Local Planning Authority before development commences in order that the development is undertaken in an acceptable manner, to ensure that the roads are laid out and constructed in a satisfactory manner.

 

17.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking or re-enacting or amending that Order with or without modification), any garages shall not be converted to habitable accommodation.

 

REASON: To secure the retention of adequate parking provision, in the interests of highway safety.

 

18.The maximum number of residential units on site shall not exceed

 

REASON: For the avoidance of doubt.

 

INFORMATIVE TO APPLICANT:

The applicant should note that the grant of planning permission does not include any separate permission which may be needed to erect a structure in the vicinity of a public sewer. Such permission should be sought direct from Thames Water Utilities Ltd / Wessex Water Services Ltd. Buildings are not normally allowed within 3.0 metres of a Public Sewer although this may vary depending on the size, depth, strategic importance, available access and the ground conditions appertaining to the sewer in question.

 

INFORMATIVE TO APPLICANT:

The applicant is requested to note that this permission does not affect any private property rights and therefore does not authorise the carrying out of any work on land outside their control. If such works are required it will be necessary for the applicant to obtain the landowners consent before such works commence.

 

If you intend carrying out works in the vicinity of the site boundary, you are also advised that it may be expedient to seek your own advice with regard to the requirements of the Party Wall Act 1996.

 

INFORMATIVE TO APPLICANT:

The consent hereby granted shall not be construed as authority to carry out works on the highway. The applicant is advised that a license may be required from Wiltshire's Highway Authority before any works are carried out on any footway, footpath, carriageway, verge or other land forming part of the highway.

 

INFORMATIVE TO APPLICANT:

Please note that Council offices do not have the facility to receive material samples.

 

Please deliver material samples to site and inform the Planning Officer where they are to be found.

 

INFORMATIVE TO APPLICANT:

Any alterations to the approved plans, brought about by compliance with Building Regulations or any other reason must first be agreed in writing with the Local Planning Authority before commencement of work.

Supporting documents: