17/00280/VAR: Stonehenge Visitor Centre, A344 Airmans Corner, Winterbourne Stoke, Wiltshire, SP4 7DE

Variation of the pedestrian and cycle route scheme agreed under Condition 27 of S/2009/1527 for the proposed permissive pedestrian and cycle path on the grassed over section of the former A344 to now be open to the public by 1st October 2017 (allowing a further year from the original agreed scheme to enable the proposed permissive path to establish itself prior to it being opened to the public)

Minutes:

Public Speakers

David Hassett spoke in objection to the application

Ian West spoke in objection to the application

Jim Pitt spoke in objection to the application

Jennifer Davies of English Heritage, spoke in support of the application

Chris Bally of English Heritage spoke in support of the application

Cllr Chris Harris of Shrewton Parish Council spoke in objection to the application

 

The Senior Planning Officer, Lucy Minting introduced the report, which recommended that the application for a variation of the pedestrian and cycle route scheme agreed under Condition 27 of S/2009/1527 for the proposed permissive pedestrian and cycle path on the grassed over section of the former A344 to now be open to the public by 1st October 2017, to allow the grass surface to be sufficiently established, be approved subject to conditions.

 

Attention was drawn to the late correspondence circulated at the meeting, detailing third party representation received from Cycling Opportunities Group for Salisbury (COGS).

 

Members of the Committee then had the opportunity to ask technical questions of the Officer. It was clarified that an expert from English Heritage had advised that the grass was not ready to be walked on.

 

Members of the public then had the opportunity to present their views to the Committee as detailed above.

 

The Unitary Division Member, Cllr Fred Westmoreland then spoke in support of the application, noting that he could see no justifiable reason to refuse this as the extension was only three months away.

 

He acknowledged the frustrations of the local residents over the way English Heritage had delivered works at the site over the years.

 

Cllr Westmoreland moved the motion of Approval in line with Officers recommendation. This was seconded by Cllr Hewitt.

 

A debate followed where key issues raised included that over time a grass track on chalk, would over time wear away and would need to be replaced.

 

The Committee noted the reassurance of the applicant that they would not apply for any further extension in the future.

 

Resolved

That planning permission be APPROVED in line with Officers recommendation, with the following conditions:

 

 

(1) The development hereby permitted shall be carried out in accordance with the following approved plans:

Alternative path route and waymarker details received 6th June 2017

Drawing no                                 As received on the 5th October 2009

AB-A-G200-E-WE rev C

AB-A-G200-E-N rev C

AB-A-G200-P-RP rev C

AB-A-G200-P-00 rev G

VC-A-G200-S-FF rev C

VC-A-G200-S-EE rev C

VC-A-G200-S-CCDD rev D

VC-A-G200-S-BB rev C

VC-A-G200-S-AA rev D

VC-A-G200-E-S rev C

VC-A-G200-E-Ea

VC-A-G200-E-E rev C

VC-A-G200-P-RP rev C

VC-A-G200-P-00 rev G

MP-A-G100-P-03 rev I

MP-A-G100-P-02 rev G

MP-A-G100-P-01 rev F

MP-A-G000-P-XP-03 rev B

MP-A-G000-P-XP-02 rev B

MP-A-G000-P-XP-01 rev B

AC-G200-PA-01 rev B

VC-A-G200-E-W rev C

VC-A-G200-E-N rev D

10110301 - SEIW-21 rev A

HB-A-G200-P-00 rev E

MP-A-G100-P-03 rev K

11110201-PA-001

10110301-SEIW_17

10110301-SEIW_18

10110301-SEIW_20

10110301-SEIW_22 rev A

10110301-SEIW_19

HB-A-G200-P-RP rev D

HB-A-G200-S-AABB rev C

HB-A-G200-S-CCDD rev C

HB-A-G200-S-EEFF rev C

SE14283-SK-C-01 rev P2

SE14283-SK-C-02 rev P3

10110301-SEIW_16

10110301-SEIW_23

8877 (A) VC 001

8877 (L) VC 001

8877 (E) VC 001

8877 (E) VC 003

8877 (E) VC 002

TH/STON/SK09 rev A

HB-A-G200-XA-00

HB-A-G200-XS-AABB rev B

HB-A-G200-XP-00 rev B

AB-A-G200-S rev C

AB-A-G200-E-S rev C

MP-A-G100-P-02 rev I

SE14283-SK-C-03 rev P6

SE14283-SK-C-04 rev P4

Environmental Statement and appendices received 5th October 2009

Transport assessment and outline travel plan received 5th October 2009

Ecological management strategy received 5th May 2010

Lighting strategy document received 5th May 2010

including plan no's -

TH/STON/LIG/500

10110301-DT05 rev D

10110301-GA002 rev D

AC-N-G1

HUB-N-G1

VC-A-G500-D-01 rev A

VC-A-G500-D-02 rev A

Tabular response of clarification of ecological matters received on the 22nd December 2009.

REASON: For the avoidance of doubt and in the interests of proper planning.

 

(2) The development shall be carried out in accordance with the approved schedule of materials and finishes to be used for the external walls and roofs and all other built structures agreed in writing by the local planning authority on 13/06/2012.

REASON:  To comply with the provisions of Section 91 of the Town and Country Planning Act 1990.

 

(3) The development shall be carried out in accordance with the approved boundary treatments and timetable for provision, agreed in writing by the local planning authority on 13/06/2012.

REASON:  To enable the local planning authority to secure the satisfactory treatment of the boundaries in the interests of the visual amenity of the World Heritage Site.

 

(4) The development shall be carried out in accordance with the approved landscaping scheme including the timetable for implementation, agreed in writing by the local planning authority on 13/06/2012.

If any plant dies, becomes diseased, seriously damaged or fails to thrive within a period of 5 years from the date of planting, or is removed, uprooted or destroyed, it must be replaced by another plant of the same kind and size and at the same place, unless the local planning authority agrees to a variation beforehand in writing.

Retention of existing trees and shrubs

No tree, shrub, or hedge which are shown as being retained on the approved plans shall be cut down, uprooted, wilfully damaged or destroyed, cut back in any way or removed other than in accordance with the approved plans and particulars, without the written approval of the local planning authority.

All tree works approved shall be carried out in accordance with British Standard Recommendations for Tree Work (B.S.3998: 1989). If any tree, shrub or hedge shown to be retained in accordance with the approved plans and particulars is removed, uprooted or destroyed, or dies, or becomes severely damaged or diseased within 5 years of the completion of the development, another tree, shrub, or hedge shall be planted at the approximate same place, and that tree, shrub, or hedge shall be of such a size specification, and species, and should be planted at such time as may be specified in writing by the Local Authority. If within a period of five years from the date of planting any replacement tree is removed, uprooted or destroyed, or dies or becomes seriously damaged or defective another tree of the species and size as that originally planted shall be planted at approximately the same place, unless the Local Planning Authority gives its written consent to any variation.

REASON:  To comply with the duties indicated in Section 197 of the Town and Country Planning Act 1990 so as to safeguard the amenity of the existing trees and to ensure a satisfactory appearance of the development.

 

(5) The development shall be carried out in accordance with the approved Arboricultural Method Statement, agreed in writing by the local planning authority on 13/06/2012, unless the Local Planning Authority has given its prior written consent to any variation.

REASON:  To comply with the duties indicated in Section 197 of the Town and Country Planning Act 1990, so as to ensure that the amenity value of the most important trees, shrubs and hedges growing within or adjacent to the site is adequately protected during the period of site clearance and construction.

 

(6) The development shall be carried out in accordance with the approved details of the Visitor Transit System agreed in writing by the local planning authority on 13/06/2012 and shall be maintained and operated as approved.

REASON:  To ensure that the proposed layout can properly accommodate the operational requirements of the VTS trains and to ensure visitors who are mobility impaired can continue to access the Stonehenge monument.

Informative: The VTS will be running on a public highway. It must therefore comply with all necessary legislation related to such vehicles.

 

(7) The development shall be carried out in accordance with the approved details showing how vehicles accessing the A344 can turn around and return westbound in forward gear, (including all points where access is restricted by proposed gating), agreed in writing by the local planning authority on 13/06/2012. The development shall be operated in accordance with the approved arrangements and details.

REASON:  In the interests of highway safety and to avoid the inconvenience otherwise caused to larger vehicles that might need to gain access for highway maintenance or other purposes.

 

(8) The development shall be carried out in accordance with the approved scheme demonstrating how any gating or bollarding measures on the A344 are to be operated, their legal status, and what provisions are to be made for vehicles reasonably requiring access to the public highway and, beyond, to the stopped up section of A344 between Byway 12 and Stonehenge Bottom, agreed in writing by the local planning authority on 13/06/2012.  Gating arrangements shall only be provided and operated in accordance with the approved scheme.

REASON:  To demonstrate that a managed scheme will allow for the requirements of all proper vehicular users of the highway at all times of the day and night throughout the year.

 

(9) The development shall be carried out in accordance with the approved scheme demonstrating how any gating or bollarding measures on the A344 are to be operated, their legal status, and what provisions are to be made for vehicles reasonably requiring access to the public highway and, beyond, to the stopped up section of A344 between Byway 12 and Stonehenge Bottom, agreed in writing by the local planning authority on 13/06/2012.  Gating arrangements shall only be provided and operated in accordance with the approved scheme.

REASON: To demonstrate that a managed scheme will allow for the requirements of all proper vehicular users of the highway at all times of the day and night throughout the year.

 

(10) The development shall be carried out in accordance with the approved visitor management strategy, agreed in writing by the local planning authority on 13/06/2012.  The development shall not be operated other than in accordance with the approved visitor management strategy in perpetuity. 

REASON: In order to protect the Salisbury Plain SAC/SPA and the wider landscape and nature conservation interests.

 

(11) The development shall be carried out in accordance with the approved scheme and programme for cycle parking and storage provision at the western end of the retained A344 and for cycle parking at the eastern end, agreed in writing by the local planning authority on 13/06/2012. The facilities shall be provided in accordance with the approved scheme and programme and maintained thereafter.

REASON:  In order to facilitate the objectives of the travel planning requirements for the site insofar as they relate to encouraging pedestrian and cycle transport, and to discourage random parking of cycles within the vicinities of the Stones and the proposed Visitor Centre.

 

(12) The development shall be completed in accordance with the approved construction management plan, agreed in writing by the local planning authority on 25/06/2012.

REASON:  To mitigate the impact of construction traffic during the construction period and in the interests of highway safety on the local and strategic road network.

 

(13) The development shall be completed in accordance with the approved landscape management plan (including a statement for the long-term effective maintenance of the agreed landscape scheme and full details of all management and establishment operations over a ten-year period including details of the relevant management, and supervisory responsibilities), agreed in writing by the local planning authority on 13/06/2012 as amended by the revised landscape management plan dated 25/07/2016 and agreed in writing by the local planning authority dated 21/12/2016 for the permissive path to be opened by 1st October 2017.

The approved landscape management plan includes the provision for a review to be undertaken during the course of the plan with a final review being undertaken before the end of the ten-year period. A revised landscape management plan shall be submitted for the agreement of the Local Planning Authority before the ten years has expired. The revised details shall make similar provisions for the long-term maintenance and management of the landscape scheme. The revised scheme shall also make provision for future revision and updating. The provisions of the landscape management plan and subsequent revisions shall be adhered to and any variation shall have been agreed beforehand in writing by the Local Planning Authority. No trees, shrubs, hedges or other plants shall be removed for the duration of the landscape management scheme or its revisions, without the prior written approval of the Local Planning Authority.  Management of the landscape scheme in accordance with the landscape management plan or their agreed revisions shall not cease unless agreed in writing by the local Planning Authority.

REASON: To comply with the duties indicated in Section 197 of the Town and Country Planning Act 1990, so as to ensure that the amenity to be provided by the new landscaping is achieved and safeguarded, and to ensure satisfactory appearance to the development.

 

(14) The development shall be completed in accordance with the approved water supply and water efficiency scheme agreed in writing by the local planning authority on 13/06/2012. The approved scheme shall be maintained in perpetuity.

REASON:  The site is located on a major aquifer within the catchment of the River Avon SAC/SSSI and the South Wiltshire core strategy proposed submission document (July 2009; policy 19) includes the requirement for non-residential development to include water efficiency measures.

 

(15) The development shall be completed in accordance with the approved scheme for the disposal of foul drainage, agreed in writing by the local planning authority on 13/06/2012.  The approved scheme shall be maintained in perpetuity.

REASON:  The site is located on a major aquifer within the catchment of the River Avon SAC/SSSI. Appropriate drainage arrangements will ensure groundwater is protected.

(16) The development shall be completed in accordance with the approved construction environmental management plan and timetable, agreed in writing by the local planning authority on 25/06/2012.

REASON:  The site is located on a major aquifer with the catchment of the River Avon SAC/SSSI. Appropriate pollution prevention arrangements during construction will ensure groundwater and surface water are protected.

 

(17) The development shall be completed in accordance with the approved lighting scheme (including street lighting, lighting for the car and coach parks, lighting for footpaths, lighting at the drop off points, including intensity of the lighting and design for the light column and arrangements for testing of the works on their first operation), agreed in writing by the local planning authority on 13/06/2012.  All the works and operation of the development shall subsequently accord with the approved details.

REASON:  To ensure that the lighting scheme respects the overall design qualities required from the development and to minimise impact of the lighting scheme upon both the World Heritage Site and wider landscape and nature conservation interests and the Salisbury Plain SAC/SPA.

 

(18)  The development shall be completed in accordance with the approved written programme of archaeological investigation, agreed in writing by the local planning authority on 13/06/2012.

REASON:  To ensure that artefacts of archaeological importance are properly recorded and evaluated.

 

(19) The development shall be completed in accordance with the approved waste audit, agreed in writing by the local planning authority on 13/06/2012

REASON:  In the interests of achieving a sustainable development.

 

(20) The development shall be completed in accordance with the approved scheme of internal pedestrian footpaths within the visitor centre site, agreed in writing by the local planning authority on 13/06/2012.

REASON:  To facilitate pedestrian movement on identified desire lines.

 

(21) The retail unit within the visitor centre shall not sell goods outside of the agreed range of goods, agreed in writing by the local planning authority on 13/06/2012, other than as a minor and ancillary part of the stores operation without the prior written approval of the local planning authority.

REASON:  To enable the local planning authority to exercise adequate control over the kind of good which are sold from the premises, in the interests of maintaining the vitality and viability of Amesbury Town Centre.

 

(22) The development shall be completed in accordance with the approved details of the pedestrian and cycle route along the whole of the A344, including the approved scheme for reviewing such accessagreed in writing by the local planning authority on 25/06/2012 as amended by this application for the permissive path on the grassed over section of the A344 to be opened to the public by 1st October 2017.

Within 1 month of the date of this decision, waymarker signs (7.5cm diameter yellow discs with black directional arrows and the words “Temporary Permissive Path for Pedestrians and Cyclists” also in black) shall be attached to the adjacent fence posts in the positions shown on the route plan of the temporary path (including an additional waymarker at the junction of the A344 and Byway 12), received by the local planning authority on the 06/06/2017.  These shall be removed within 1 month of the opening of the permissive path.

REASON:  To accommodate and facilitate the inevitable future local pedestrian and cyclist demand travelling the route between the Stones and west Amesbury.

 

INFORMATIVE TO APPLICANT:

This permission shall be read in conjunction with an Agreement made under Section 106 of the Town and Country Planning Act, 1990 and dated 23rd June 2010.

 

 

 

 

 